Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Fort Bragg, California. Contact the soliciting agency for additional information.
The City of Fort Bragg is seeking proposals from qualified consultants interested in contracting with the City to prepare a Water Systems Distribution Master Plan. The purpose of the distribution master plan is to identify and prioritize critical water system improvements to the City of Fort Bragg treated water distribution system to ensure that a resilient system with adequate water facilities necessary to meet current and future demand remains available to customers in perpetuity The City of Fort Bragg owns and operates its water utility from source water to customer delivery. The City of Fort Bragg has a Water System Study and Master Plan that was completed by John Carollo Engineers, and adopted by the City Council on April 14, 1986 (36 years ago). The purpose of the study and master plan was to evaluate several aspects of the water supply system including present and future water supply sources; water treatment plant components; bypassing Newman Reservoir; physical improvement of existing sources; and computer simulation of the existing and future distribution systems using University of Kentucky's "Computer Analysis of Flow in Pipe Networks." Recommendations within the plan were based on information contained within the 1980 General Plan and were estimated to include development through the year 2000. Much of the work recommended from the 1986 plan has been completed and numerous changes within the community have taken place affecting current water usage as well as future demand. The City has since adopted new General Plans (2008 and 2012), installed numerous capital improvements to the water system, and worked on a reuse plan for the Mill Site property covering about 1/3 of the City that upon development will create new demands on the water system. In November 2013, the City contracted with KASL Engineers to prepare a Water Facilities Study, which includes existing water collection, distribution, and capacity. This study also identified and prioritized critical improvements to the City water supply and treated water distribution systems, network modeling of the existing treated water distribution system, and evaluated the capacity of raw water and treated water systems. They created an in-house Network Hydraulic Model of the City's distribution system for the analysis. That model was updated with the proposed industrial north side water extension in 2019. Deadline for Written Questions December 9, 2022 Questions should be directed to: Chantell O'Neal City of Fort Bragg 416 North Franklin Street Fort Bragg, CA 95437 (707) 961-2823 ext. 133 Email: coneal@fortbragg.com The City of Fort Bragg reserves the right to reject any and all proposals. This Request for Proposals does not commit the City to award contract, pay any costs incurred in the preparation of proposals, or to procure or contract for supplies or services. The method of Contractor Selection has not been Determined at this time
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2023
Multiple Locations, Fort Bragg, CA
Related To This Project
Fort Bragg, CA
Bid Date: Jan 18 2023
Fort Bragg, CA
Bid Date: Jun 29 2023
Fort Bragg, CA
Bid Date: Apr 15 2022
Fort Bragg, CA
Bid Date: May 20 2022
Fort Bragg, CA
Bid Date: Jun 23 2022
Fort Bragg, CA
--
Fort Bragg, CA
Bid Date: Sep 02 2022
Fort Bragg, CA
--
Fort Bragg, CA
Bid Date: Dec 02 2022
Fort Bragg, CA
Bid Date: Nov 10 2022
Fort Bragg, CA
--
Fort Bragg, CA
Bid Date: Nov 14 2022
Fort Bragg, CA
Bid Date: Sep 07 2022
Fort Bragg, CA
--
Fort Bragg, CA
Bid Date: Oct 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.