BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2024 at 7:00 PM

Updated February 27, 2024

Site work for a civil project in Springfield, Missouri. Working plans call for site work for a water / sewer project.

**As of February 26, 2024, project will not be awarded. No definite date for the rebid.** The scope of this project is to eliminate the existing Lester Jones Ave Lift Station by constructing a new gravity line. The new gravity line will route the sanitary sewer from the upstream side of the Lester Jones lift Station to an existing gravity sanitary line located east of the taxiway. The scope includes over 1100 linear feet of new 10 sanitary sewer and 262 linear feet of bore under the existing concrete apron. The project will require working on airport property and the Contractor will need to follow FAA safety and security procedures. IFB-IFB 053-2024-0-2024/KG Question Deadline 01/25/2024 at 3:00 PM Each bidder shall examine all Invitation for Bid documents and shall judge all matters relating to the adequacy and accuracy of such documents. All labor utilized in the construction of this project shall be paid a wage of no less than the prevailing hourly rate of wages for work of a similar character in this locality, as established and amended at any time by the Department of Labor of the State of Missouri, in accordance with prevailing wage as set forth in Annual Missouri State Wage Determination No. 30, Section 039, Greene County, and all addenda, and fully complied with the provisions and requirements of the Missouri State Prevailing Wage Law (Section 290.250, RSMo.), or by the U.S. Secretary of Labor in accordance with the Federal Davis-Bacon Act (Title 40 U.S.C. Chapter 31, subchapter IV), whichever is higher. The successful bidder shall secure licenses imposed by law and ordinance and pay all charges. The bond so furnished shall be in the amount not less than five percent (5%) of the amount of the total bid price.

Final Planning

Water / Sewer

$1,299,547.00

Public - City

Site Work

12

6

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
44
Bidding Soon
681
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

August 26, 2024

Project location map

N Lester Jones Ave, Springfield, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.