BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2022 at 7:00 PM

Updated January 25, 2024

Demolition, site work, paving and new construction of a mixed-use development in Fort Wayne, Indiana. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

City of New Haven PE and R/W, South Maplecrest between SR 930 and Seiler Road with intersection improvement installation of an alternate roundabout (Des # 2100622 and 2101081) in the Fort Wayne District. This Request for Proposals (RFP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered. Contact for Questions: Alex Bourke, ERC 815 Lincoln Highway E New Haven, IN 46774 260-748-7034 Abourke@newhaven.in.gov Local Public Agency: City of New Haven Project Location: South Maplecrest Road between SR 930 and Seiler Road Project Description: This improvement will reconstruct the roadway to create a three lane section from State Road 930 to Seiler Road involving reconstruction of the bridge over the Trier Ditch. The center lane will be a bi-directional turn lane. There will also be consideration of an intersection improvement of Moeller Road and South Maplecrest Road with a roundabout. This project will also include installation of a pedestrian trail and sidewalk. Phases Included: PE & RW Funding: Construction - STBG (80/20) Term of Contract: Until Project Completion The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - South Maplecrest Between SR 930 and Seiler Road With Intersection Improvement Installation of an Alternate Roundabout

Conceptual

Roads / Highways

$7,500,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
134
Bidding Soon
1,282
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2023

Project location map

Maplecrest Rd, Fort Wayne, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.