BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Marietta, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of February 14, 2023. The project has been awarded to BACKBONE INFRASTRUCTURE. BASE BID - $323,690.00, BID ALTERNATE - $355,815.00 The work to be done consists of furnishing all materials, labor, tools, skills, equipment, and incidentals for the construction of the aforementioned project. The approximate principal items for construction are. All questions concerning the project shall be addressed via e-mail to Shelly Drewry atsdrewry@mariettaga.gov. Questions will not be responded to after Friday, December 9th, 2022, at 5PM. Answers will be provided and shared with all bidders.Each bid or proposal must be accompanied by a cashier's check or certified check on a duly organized bank made payable to the City of Marietta or a bid bond executed by the bidder and surety company authorized to transact business in the State of Georgia, in the sum of not less than five percent (5%) of the total amount of the base bid. Said check or bond will be returned to unsuccessful bidders as soon as the Contract between the Owner and the successful bidder has been executed by the Owner.All bids must be made out on the bid form furnished in the contract documents, in accordance with the instructions in the Information for Bidders. No interlineations, additions or deletions shall be made in the bid form by the bidder No bid may be withdrawn after the scheduled closing time for receiving bids for a period of ninety (90) days. Only a bid or proposal submitted by a bidder on record with the City of Marietta as having received the bid documents and attended the mandatory pre-bid conference will be opened. The City reserves the right to reject any or all bids, to waive formalities and re-advertise; and to reduce or add to the contract from time to time. The City shall pay the contractor for performance of the work after completion and acceptance of the work by the City.One contract will be awarded covering all the work, and the time for completion shall be 180 calendar days for the base bid items. Due consideration will be made with respect to time charged to the project based on weather issues. All questionsshould be sent via email to Sdrewry@mariettaga.gov .The deadline for questions is Friday, December 9th at 5:00 P.M.

Award

Roads / Highways

$323,690.00

Public - City

Paving, Site Work

80

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
64
Bidding Soon
1,475
All Active Projects
553
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2022

January 16, 2023

img_map_placeholder

Multiple Locations, Marietta, GA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.