BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 20, 2022 at 7:00 PM

Updated April 30, 2024

Renovation of an educational facility in Beach Park, Illinois. Completed plans call for the renovation of a educational facility.

PROJECT DESCRIPTION A. The Project consists of the following general activities as described in the Construction Documents and Project Manual for the D3 Oak Crest Early Learning Center project, located in Beach Park, Illinois for Beach Park School District 3. B. The work of the Project shall include all labor, material, and equipment to provide complete installation of all work including all code required devices and functions that may not specifically be indicated in this Project Manual. 1. The work includes (not to be taken as a complete description or extent of the work) as follows: a. Selective demolition of existing roofing, gutter, fascia, exterior masonry wall, interior framed wall. b. Installation of new concrete, cavity masonry walls, roof framing, roof sheathing, shingles, etc. to create a connection to a new firewall & modular unit (by Vesta). c. Civil work to include new paved turnaround, parking lot, play areas, etc. as shown within the documents. 2. Commencement of Work: Demolition and construction to begin as noted below: a. As early as Monday, April 3, 2023. 3. The Work includes scheduling coordination with the Owner or Owner's contractor(s) for site access and usage. The Board of Education of Beach Park School District 3 will receive sealed bids for the D3 Oak Crest Early Learning Center, located in Beach Park, Illinois. Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% Completion Date: August 11, 2023

Award

Educational

$1,165,000.00

Public - State/Provincial

Renovation

22

24

12

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
508
Active Projects
280
Bidding Soon
3,643
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

April 3, 2023

Project location map

38550 N Lewis Ave, Beach Park, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.