BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Beach Park, Illinois. Completed plans call for the renovation of a educational facility.

PROJECT DESCRIPTION A. The Project consists of the following general activities as described in the Construction Documents and Project Manual for the D3 Oak Crest Early Learning Center project, located in Beach Park, Illinois for Beach Park School District 3. B. The work of the Project shall include all labor, material, and equipment to provide complete installation of all work including all code required devices and functions that may not specifically be indicated in this Project Manual. 1. The work includes (not to be taken as a complete description or extent of the work) as follows: a. Selective demolition of existing roofing, gutter, fascia, exterior masonry wall, interior framed wall. b. Installation of new concrete, cavity masonry walls, roof framing, roof sheathing, shingles, etc. to create a connection to a new firewall & modular unit (by Vesta). c. Civil work to include new paved turnaround, parking lot, play areas, etc. as shown within the documents. 2. Commencement of Work: Demolition and construction to begin as noted below: a. As early as Monday, April 3, 2023. 3. The Work includes scheduling coordination with the Owner or Owner's contractor(s) for site access and usage. The Board of Education of Beach Park School District 3 will receive sealed bids for the D3 Oak Crest Early Learning Center, located in Beach Park, Illinois. Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% Completion Date: August 11, 2023

Award

Educational

$1,165,000.00

Public - State/Provincial

Renovation

22

24

12

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
125
Bidding Soon
1,994
All Active Projects
844
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

April 3, 2023

img_map_placeholder

38550 N Lewis Ave, Beach Park, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.