BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a stadium in Hagerstown, Maryland. Completed plans call for site work for a stadium.

Turner Construction is pleased to request participation from your company in submitting a bid proposal in accordance with the following request. Bid Proposals, Pre-qualification statements and other applicable information will be received and accepted until the date and time above. Any proposal received after this date and time may not be accepted. The Hagerstown Multi-Use Sports and Events Facility will be a state of the art, family-friendly venue with flexibility to include the hosting of outdoor concerts, festivals, community, and family-oriented events, as well as serving as the home field for an Atlantic League Professional Baseball Club. Additionally, the facility will be designed to host other sports, cultural, and community events. The project will include demolition of existing buildings located on the site, site enabling work, and construction of the new facility, inclusive of structure, turf, seating, The facility will be a catalyst for downtown revitalization and inspire further economic development and tourism for Washington County and western Maryland. The tentative constructions start, and completion date is September 2022 through April 2024. Turner Construction Company is requesting bids related to work performed for the Hagerstown Multi-Use Sports and Events Facility. Questions during bidding shall be submitted in writing on your letterhead by e-mail to Turner Construction Company, Attn: Chelsea Macco at cmacco@tcco.com no later than November 22, 2022 3pm. The design team has been advised that all questions must be addressed through Turner, and no individual questions will be responded to except through the proper channels. All questions and requests for information should be directed to Chelsea Macco with Turner Construction Company at cmacco@tcco.com. MBE Participation (%): 29.0 African American MBE Participation (%): 8.0 Women-Owned MBE Participation (%): 11.0

Post-Bid

Arenas / Stadiums

$500,000.00

Public - State/Provincial

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
425
Active Projects
195
Bidding Soon
2,917
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2022

December 29, 2022

Project location map

100 Summit Ave, Hagerstown, MD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.