Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 15, 2022 at 7:00 PM
Updated January 25, 2024
Site work and outdoor lighting for a mixed-use development in Raton, New Mexico. Completed plans call for site work for a library; swimming pool; theater / auditorium; and for outdoor lighting for a library.
For Regional Aquatic Center, Shuler Theater and Library Lighting Retrofit Project. Bid security in the amount of 5% of the bid amount must accompany each bid in accordance with the instruction to bidders. The work shall generally consist of retrofit of existing exterior mounted lighting all the way around the Regional Aquatic Center, Shuler Theater, and Library where applicable and interior exit lighting, retrofitting existing lighting, and legal and proper disposal of existing fixtures and fluorescent bulbs. Replacement shall include provision and installation of all retrofit lighting components and appurtenances and electrical/ structural modifications required for a functional operational system.
Award
Library
$49,092.00
Public - City
Outdoor Lighting, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 6, 2022
January 5, 2023
To Be Determined, Raton, NM
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
