Published April 28, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Lexington, Michigan. Completed plans call for site work for a water / sewer project.

Lexington Harbor Breakwater Repair includes repair operations on the north breakwater, a permeable rubble mound structure that currently allows sand to infiltrate and shoal within the harbor. Voids within the breakwater are contributing to sediment movement, and although the existing 5-foot-wide concrete walkway atop the structure is generally in good condition, the underlying sand-filled voids vary in depth and typically extend to the water level. The project objective is to convert the permeable structure into an impermeable one by constructing a grout curtain wall within the breakwater. Chemical grout will be installed within the sand-filled portions of the structure, while cementitious grout will be used above those areas. This grout curtain wall is intended to prevent further sand migration through the breakwater. Upon completion of grouting operations, the Portland cement concrete walkway will be reconstructed. The Bidder Inquiry System will stop receiving new inquiries ten (10) business days before the bid due date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PN - 506358, W911XK, 751/17267.BDW This project includes breakwater repair operations at Lexington Harbor. The north breakwater is a permeable rubble mound structure and allows sand shoaling within the harbor. Voids in the north breakwater are exacerbating sediment infiltration within the harbor. A walkway is present atop the north breakwater. The walkway is approximately 5 feet wide and generally in good condition. The north breakwater voids are partially sand filled. The sand fill depth varies; however, sand generally extends to the existing water elevation. The project objective is to alter the existing permeable rubble mound breakwater structure to an impermeable structure. The proposed scope of work includes constructing a grout curtain wall within the structure. The proposed grout curtain wall is chemical grout and a cementitious grout material. The chemical grout material is proposed within the sand filled breakwater structure. The cementitious grout material is proposed above the sand filled area. The intent of the grout curtain wall is to prevent sand from infiltrating through the breakwater structure. The existing Portland cement concrete walkway is reconstructed upon completion of grouting operations. As previously stated, the project includes breakwater repair by constructing a grout curtain wall and Portland cement concrete walkway reconstruction.

Award

Water / Sewer

$11,670,060.00

Public - Federal

Site Work

37

10

26

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
393
Active Projects
226
Bidding Soon
2,648
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

May 8, 2026

Project location map

Huron Ave, Lexington, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.