Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published December 22, 2022 at 7:00 PM
Updated September 15, 2023
Renovation of an educational facility in Newton Grove, North Carolina. Completed plans call for the renovation of a educational facility.
A. The work of this project is defined in the Contract Documents and includes, but may not be limited to the following: 1. Removal of the existing built-up asphalt roof with granular cap sheet and gravel at main building. Metal roof deck shall remain. 2. Inspection of existing roof drains. Existing roof drains shall be verified for functionality. Roof drains that are not functioning as intended shall be repaired/unclogged as necessary or replaced as required. 3. Existing roof assembly thickness at roof drains shall be maintained to allow for new roof assembly to fit without altering the height of the roof drains. 4. Cleaning of existing surfaces to remain. 5. Installation of self-adhered vapor barrier to existing metal deck. 6. Installation of self-adhered vapor barrier to existing gypsum concrete deck. 7. Mechanical attachment of new ISO insulation board at steel deck. 8. Adhesive attachment of new ISO insulation board at Gypsum concrete deck. 9. Adhesive attachment of cover board and PVC membrane. 10. In areas where the Contractor and Engineer determine that steel deck or other roof deck needs to be repaired or replaced due to deterioration, Contractor shall ensure that concealed spaces above lay-in ceilings are free from roof debris resulting from roof deck replacement. For the Hobbton High School Roof Replacement. The project consists of the removal of existing built-up asphalt roof at this location as indicated in Drawings. This is a partial roof replacement project. Roof shall be replaced with new ISO insulation board and new PVC membrane.
Bid Results
Educational
$1,015,326.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed