Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 22, 2022 at 7:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Coalville, Utah. Contact the soliciting agency for additional information.
Question Deadline 11/25/2022 at 5:00 PM MT The peer review shall consist of the following: Shall evaluate the data used and generated by the applicant's proprietary traffic analysis software (Fehr & Peers' MainStreet software) by comparing it with the Institute of Transportation Engineers' data and best practices, including land use codes, pass-by trips, and internal capture reductions. See Traffic Impact Study (TIS) in Attachment A. Shall review the neighborhood area and SR-224 corridor traffic counts including weekends, peak periods, seasonal adjustments, and holiday-period counts presented in the TIS in Attachment A by comparing existing UDOT and Summit County traffic counts. Shall review and compare the traffic volumes and trip distribution generated by (all plans are found in the TIS in Attachment A): o the existing approved (Tech Center) plan 2008 o the previous plan reviewed by Summit County Council in December 2021 o the revised development plan submitted in October 2022 Shall review on-site streets/roads and off-site streets/roads in the vicinity to identify concerns regarding the capacity of roads and intersections used by or providing access for traffic from the development. Shall review mitigation measures that are to be considered if UDOT's SR-224/Kimball Junction improvements are delayed or not implemented. See TIS in Attachment A. Shall review trip distribution and assignment assumptions as well as ITE land use codes used in TIS found in Attachment A. Shall review the VISSIM model used for the study and perform a re-analysis. Shall prepare a memorandum of findings from the review and comparison of results and assumptions. Shall attend at least one Summit County Council meeting to present findings of peer review. Shall sign an affidavit that states the consultant group has not worked with Dakota Pacific Real Estate or it's associates and there is no conflict of interest. The Method of Contractor Selection has not been determined at this Time.
Conceptual
Roads / Highways
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2023
Multiple Locations, Coalville, UT
Related To This Project
Coalville, UT
Bid Date: Jan 04 2023
Coalville, UT
Bid Date: Apr 12 2022
Coalville, UT
Bid Date: May 26 2022
Coalville, UT
Bid Date: Apr 15 2022
Coalville, UT
Bid Date: Apr 12 2022
Coalville, UT
Bid Date: Jul 21 2022
Coalville, UT
Bid Date: Apr 30 2021
Coalville, UT
Bid Date: Aug 23 2022
Coalville, UT
Bid Date: Oct 06 2022
Coalville, UT
--
Coalville, UT
Bid Date: Aug 25 2022
Coalville, UT
Bid Date: Nov 02 2022
Coalville, UT
Bid Date: Oct 27 2022
Samak, UT
Bid Date: Dec 15 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
