Site work for a water / sewer project in Marengo, Ohio. Completed plans call for site work for a water / sewer project.

For Island, Westmeyer, Marengo Water Main Replacements Type of Award Lump Sum Bid Valid 90 Days Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Pre-Bid Meeting No Online Q&A Yes Q&A Deadline 11/30/2022 2:00 PM (EST) This project will install approximately 1,038 feet of 8" ductile iron pipe to replace existing 4" and 6" pipe on Island Ave. from Romona Dr. to Westmeyer St.; install approximately 638 feet of 8" ductile iron pipe to replace existing 6" pipe on Westmeyer St. from Island Ave. to River Rd.; install approximately 754 feet of 8" ductile iron pipe to replace existing 4" pipe on Marengo St. from Island Ave. to River Rd. The City of Toledo has pre-ordered typical 638 items to ensure availability for projects that include water main replacements. These items are listed in the General Summary as Item Special - Installation for pipe, valves and hydrants. Refer to Water General Notes, Sheet 7 for more information. Delivery of these materials is expected by the end of March 2023. Bids for this project can only be accepted electronically. All lines shall be quoted. All bids must have the required paperwork and bid guaranty attached with this e-bid in order to be deemed responsive. If you are e-bidding and are using a check as the bid guaranty, the check must be received by the Division of Purchases and Supplies no later than the due date and time to be deemed responsive. The bid guaranty may be a bid bond or a certified check or cashier's check on a solvent bank. City forms must be filled out and attached to the bid: Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; MBE Good Faith and Goal Commitment; EEO Form; Suspension and Debarment; Primary and Subcontractor Forms; Best Bid Criteria; Signed Contract by Vendor CEO/President ; MBE Participation form; Certificates of Insurance; Current Worker's Compensation Certificate; Court-Ordered Child Support Affidavit; Independent Contractor PERS forms; and additional Insurance as Required. Prevailing Wages are required for this project. It is the obligation of a contractor or subcontractor to make payment in accordance with the prevailing wage determinations. Current prevailing wage rates may be found on the Division of Purchases and Supplies electronically.

Bid Results

Water / Sewer

$889,182.00

Public - City

Site Work

20

5

14

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Curing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Planting, Planting Preparation, Mulching, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
76
Bidding Soon
1,510
All Active Projects
605
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2022

January 12, 2023

img_map_placeholder

Multiple Locations, Marengo, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Island, Westmeyer, Marengo Watermain Replacements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.