BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Tucson, Arizona. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The full reconstruction of a two-lane undivided roadway section to add bike lanes and sidewalk along Ignacio M. Baumea between Calle Torim and Los Reales Road, totaling 0.49 mile. Bid Work includes earthwork, the extension of a reinforced concrete box culvert, new pipe culverts, and associated inlet and outlet mitered ends, headwalls as shown, channel and roadside ditch excavation and erosion protection, furnishing and placing aggregate base and asphaltic concrete, constructing concrete curb, sidewalk, pavement markings, lighting, landscaping and irrigation, installation of artwork, and related incidental work., located on the New Pascua Reservation in Tucson, Arizona. Estimate for construction is approximately $3.5 - $4.5 million. RFI's will be accepted through 5:00 PM, Wednesday, March 1, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Native American and local firms will receive preference. The Owner reserves the right to select the most responsive and responsible bidder Each bid shall be made out on the bid form marked "04 Exhibit (A) - Bid Schedule Form", which shall be accompanied by a certified or cashier's check or bid bond for 5 percent (5%) of the total amount of the bid. Such check or bid bond will be given as a guarantee that the bidder will enter into the contract to perform the work if awarded to them and shall be declared forfeited as liquidated damages if the successful Bidder refuses to enter into the said Contract after being requested to do so by the Owner. Such check of bid bond will be returned to the respective unsuccessful Bidders upon the Award of the Contract to the successful Bidder and will be returned to the successful Bidder upon the execution and delivery of satisfactory surety company bonds and construction contract. Award of this Contract is subject to a determination by the Tribe that the contractor is eligible to contract for federally funded activities. The Contract time allotted for this project is 240 working days.

Post-Bid

Roads / Highways

$4,500,000.00

Public - Federal

Paving, Site Work

17

5

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
170
All Active Projects
68
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2023

May 15, 2023

img_map_placeholder

S Ignacio M Baumea, Tucson, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.