Demolition, site work, renovation and addition to a playground / park / athletic field in Raceland, Kentucky. Completed plans call for the addition of a 4,600-square-foot playground / park / athletic field; for the demolition of a playground / park / athletic field; for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

**As of  February 14, 2023 this project has not yet been awarded. A timeline or award has not yet been established.**  Raceland-Worthington Independent Schools Board of Education (Hereinafter referred to as Owner) invites proposals to provide all Work, including but not limited to labor, material, equipment, supplies and transportation for RACELAND-WORTHINGTON FOOTBALL RENOVATIONS & ADDITION 550 RAM DRIVE, RACELAND, KY 41169 All bids must be submitted in accordance with the Bidding Documents issued by the Architect and this Invitation to Bid. A full description of the Project is found in the Summary Section 01 10 00 of the Project Manual. Bidders will be required to provide Bid security in the form of a Bid Bond or certified check in an amount not less than 5% of the total amount bid, including all add alternates, supported by a Power of Attorney for the bonding agent, a certificate from the Department of Insurance authorizing the Surety Company to do surety business in the commonwealth of Kentucky and a current financial statement of the Surety Company. The bonds shall be on the forms bound in the Project Manual. Bid Documents may be viewed at the office of the Architect (Edward Tucker Architects Inc., 1401 Sixth Avenue, Huntington WV 25701, tel. 304-697- 4990), the Owner (Raceland-Worthington Board of Education, 600 Ram Boulevard, Raceland, KY 41169, tel. 606-836-2144), Bid Bonds submitted by the unsuccessful bidders will be returned promptly after opening of the bids, except those of the two lowest bidders will be retained until the award of the contact is made to the successful bidder and after a Performance Bond in the amount of one hundred percent of the contract has been executed by the successful bidder. A Contract Performance Bond and Payment Bond each equal to one hundred percent of the Contract Price will be required for the successful Contractor. Other bidding requirements are described in the Project Manual. Bidder will be required to complete the Work (Substantial Completion) within 365 (three hundred and sixty five) calendar days from the date of commencement. As actual damages for delay in completion of the Work are impossible to determine, the successful Bidder (Contractor) and his Surety shall be liable for and shall pay to the Owner the sum of $500, not as a penalty, but as fixed, agreed and liquidated damages for each calendar day of delay until the Contract Work is substantially completed as in the General Conditions of the Contract for Construction. Submit offer on the Bid Form provided. Bidders will be required to submit offer under a condition of irrevocability for a period of 60 days after submission. The Owner reserves the right to accept or reject any or all bids, to waive informalities, and to re-advertise. The cutoff date for addendum items and all requests for substitutions or alternate manufacturers is 5:00 pm EST January 5, 2023. Final addendum will be distributed on January 6, 2023. D. The Project consists of renovations and an addition to the existing Football Locker Room facility located at 500 Ram Drive, Raceland, KY 41169. The gross existing building area is approximately 2,000 square feet. Additions of approximately 4,600 square feet consist of an increase to the existing Second Floor over the existing building plus a single story addition that adjoins the existing building's west side. E. Site work is limited to a concrete pedestrian plaza, walks, and minor tie-ins to existing storm drainage. F. Construction work includes concrete foundations, concrete slab on grade, concrete masonry unit walls, incidental structural steel framing, wood framed floors and roofs, metal siding and soffits, manufactured stone cladding, aluminum storefront and glazing, TPO low slope roofing; selective demolition of interior walls, fixtures, systems, and finishes; hollow metal doors and frames, wood doors, non-load bearing interior partitions; ceilings, wall and floor finishes; new casework; new HVAC, plumbing, fire protection; lighting, electrical, and telecommunication systems

Bid Results

Playgrounds / Parks / Athletic Fields

$2,081,959.00

Public - City

Addition, Demolition, Renovation, Site Work

47

27

6

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Decking, Sheathing, Architectural Woodwork, Architectural Wood Casework, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Membrane Roofing, Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Tile Flooring, Static-Control Resilient Flooring, Resilient Athletic Flooring, Terrazzo Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Plastic Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Duct Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, Central Cooling Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Public Address and Mass Notification Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Planting, Plants, Shrubs
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
27
Bidding Soon
319
All Active Projects
146
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2023

March 13, 2023

img_map_placeholder

550 Ram Dr, Raceland, KY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Football Locker Room Renovations and Addition

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.