Site work and renovation of a water / sewer project in Mesquite, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Scope of Work Inclusions 1. Wage rates in accordance with specification section 00 43 43. 2. For Contract Specification Sections 0&1, when reference is made to CMAR, statements will apply to the Proposer for this contract. 3. All submittals, RFI's, and project documentation will be submitted to the CMAR for this contract. 4. Provide initial submittal packages within 6 weeks of receipt of Subcontract agreement including submittal schedule. 5. Provide a detailed Schedule of Values and Preliminary CPM Schedule within 21 days of executed Subcontract Agreement with CMAR. 6. Provide adequate temporary access to work areas and complete and proper removal of temporary access at completion of contract. 7. Temporary facilities and utilities for construction are the responsibility of the proposer. 8. Stormwater pollution prevention plan TXR1589MY per TCEQ & NTMWD requirements along with all required installation, maintenance, and upkeep per the contract documents for the life of the Proposer's contract. 9. Job site cleanup and proper disposal for work under this subcontract is to be carried out on a daily basis. 10. Temporary dewatering for the work under this subcontract is the responsibility of the proposer. 11. Maintenance of Record Drawings for all work under this subcontract, provide information to CMAR each month with application for payment. 12. Monthly payment applications & progress schedule to be submitted by the 5th of each month for work completed to that date. Progress schedule is to be provided in .PDF and .XER format. 13. Retainage is 5%, see section 00 72 00 Standard General Conditions for release of retainage. 14. Provide warranty as required per the specifications. 15. Freight to the project site. 16. Attendance at bi-weekly project schedule meetings. 17. All work to be coordinated with CMAR's Project Superintendent. 18. Payment and performance bonds per Subcontract Agreement. 19. Project Schedule shall be per requirements outlined in Specification 01 11 00 Summary of Work. 20. Coordination with CMAR through Package 4 - Early Electrical Equipment Procurement for CMAR provided Transformers, Generator Switchgear, This project includes the construction of the South Mesquite Creek RWWTP Questions Due Date: May 11th 2024, 2:00 PM CDT

Bid Results

Water / Sewer

$56,000,000.00

Public - State/Provincial

Renovation, Site Work

418

47

83

6

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
99
Bidding Soon
3,689
All Active Projects
1,455
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.