BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a laboratory facility in Berkeley, California. Completed plans call for the renovation of a laboratory facility.

Sol : 12905B23C0004 The United States Department of Agriculture (USDA) Agricultural Research (ARS) Pacific West Area (PWA) Western Regional Research Center has a requirement for the and construction of electrical systems and installation of utility equipment at two locations at its facility at 800 Buchanan Street, Albany, CA. The facilities are the Western Annex Building (hereby known as the WAB) and the Solvent Extraction Building. Both locations involve installation of Govt. Furnished and Contractor furnished utility equipment. The equipment installations at the WAB include SteamGenerators with associated kits, Autoclaves, and Dishwasher with water tank.To support the above equipment, additional power and installation of electrical components is required in these locations. The project as whole can be divided into three major parts: 1. Installations of Govt. Furnished equipment. 2. Installation of contractor purchased equipment 3. and Installation of electrical systems to support the equipment The Government purchased equipment includes: 2 Steam Generators for 3 Autoclaves 1 Dishwasher with pH & temp adjustment tank Solvent Extraction Building: The solvent extraction building requires an electrical panel upgrade. Currently there is a 100 Amp panel. A 200-amp panel and appropriate supply wiring is required. SITE : A site is scheduled for Monday February 20, 2023, at 10.00 a.m. Pacific Time. See Section L.4 of attached solicitation for more informaiton and RSVP instructions. PROJECT LOCATON United States Department of Agriculure (USDA) Agricultural Research (ARS) Pacific West Area (PWA) Western Regional Research Center 800 Buchanan Street Albany, CA 94710 Between $250,000 and $500,000. All questions pertaining to this solicitation, including questions that arise during the site , must be submitted to spencer.hamilton@usda.gov by 5:00 p.m. Pacific Time, February 28, 2023. *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (25.6%), WBE (6.9%), SBE (100%)

Award

Laboratories

$572,117.00

Public - Federal

Renovation

3

6

4

8

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
90
Bidding Soon
1,839
All Active Projects
776
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2023

July 13, 2023

img_map_placeholder

800 Buchanan St, Berkeley, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.