BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Philadelphia, Pennsylvania. Completed plans call for the renovation of a educational facility.

**As of March 2, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The Samuel L. Paley Hall Renovation Project ("Project") will modernize Samuel L. Paley Hall as the new home for Temple's College of Public Health ("CPH"). The Project will locate CPH in the heart of Temple's main campus and bring new life to the former library building. The Project involves the partial demolition, complete renovation and re-purposing of the existing three-story building. The Scope of Work includes, without limitation, demolition of the facade, removal of the mechanical penthouse and roof structure, complete interior renovations, infrastructure upgrades, expansion of the building's footprint including a five-story addition, a fourth floor and partial fifth floor overbuild, and transformation of the building's facade. The total gross square footage of the building will be approximately 310,000 square feet. The Project is seeking LEEDv4 Silver certification and WELLv2 Silver certification. This Project is subject to a Delegation Agreement between Temple, the Pennsylvania Department of General Services and the Governor's Office of the Budget. This Project will be a multi-prime project delivered pursuant to a multi-prime contract delivery structure. The Prime Contractors will include: General Construction, Mechanical-HVAC, Electrical, Plumbing and Fire Protection, Low-Voltage-AV/IT/TelCo, Early Demolition, and each other contractor engaged directly by Temple to perform construction or supply machinery, materials, equipment or labor for construction of the Project and which are identified by Temple as being a Prime Contractor for the Project. Electrical Construction The Scope of Work for the Electrical Construction Package shall include all necessary services, Work, labor, materials, supervision, tools, supplies, equipment, insurance, and applicable taxes necessary to complete Electrical Construction Package as shown in the Contract Documents for the above referenced Project. The Scope of Work for the Electrical Construction Package is further specified in the Agreement, the Scope of Work, the Plans and Specifications, and other documents that will be uploaded to TUebid as part of the solicitation. Release of Electrical Construction The Electrical Construction Package is tentatively scheduled to be released for bid on December 9, 2022 with bids to be due on January 24, 2023. All bidding information is released and processed through TUebid, Temple's on-line solicitation management system. To be invited to participate in the bidding process through TUebid, interested parties must contact Naomi Greenberg via e-mail at projects@temple.edu for written instructions by no later than 2:00 p.m. EST, December 6, 2022. Insert the wording "Electrical Construction Package - Vendor Registration" in the subject line. If you are already registered as a Temple vendor and in the TUebid system, you must indicate your interest in this Project by contacting Naomi Greenberg via e-mail at projects@temple.edu by no later than 2:00 p.m. EST, December 6, 2022. Insert the wording "Electrical Construction Package - Pre-Registered Vendor" in the subject line. *Addendum 1, 2, 3, 4, 5, 6 and 7 have been released. *1.) The owner has provided a Bid Extension. 2.) Attached is updated answers to RFIs as of 1/05/23. Please review and adjust your proposals accordingly. 3.) Please take notice to the previously sent attached bid form. We ask that you break out your proposal accordingly. a.) Provide Base Bid 1 and break out per schedule of vales b.) Provide Bond cost only for certain trade designated as critical work (See bid form). c.) Provide alternate price that affects your trade. d.) Provide break out cost for Mock Ups (that is included in your base bid). Check specifications if it's required for your specific trade. e.) Provide insurance cost that is excluded from Total Proposed Cost of Work as result of the OCIP program. The Scope of Work forthe Electrical Construction Package shall include all necessary services, Work, labor, materials, supervision, tools, supplies, equipment, insurance, and applicable taxes necessary to complete Electrical Construction Package as shown in the Contract Documents for the above referenced Project. The Scope of Work for the Electrical Construction Package isfurtherspecified in the Agreement, the Scope of Work, the Plans and Specifications, and other documents that will be uploaded to TUebid as part of the solicitation. E2019037A *Addendum #8 has been uploaded for the project and you will need to access it accordingly. It includes the following documents: 1.) 93013 Ceramic Tiling (Revised Spec). 2.) 096519 Resilient Tile Flooring (Revised Spec). 3.) Exterior Section Details A422 (Revised Drawing Sheet). 4.) Exterior Section Details A423 (Revised Drawing Sheet). 5.) Exterior Plan Details A434 (Revised Drawing Sheet). 6.) Enlarged Ramp and Roof Stairs...(Revised Drawing Sheet). Bid Results Base Bid 1 Mulhern Electric Company, Inc - $18287926 Base Bid 2 Mulhern Electric Company, Inc - $19114926 Base Bid 3 Mulhern Electric Company, Inc - $1,94,10,926 Base Bid 4 Mulhern Electric Company, Inc - $1,96,87,926

Bid Results

Educational

$76,501,704.00

Public - State/Provincial

LEED Certification, Renovation

389

42

65

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
404
Active Projects
206
Bidding Soon
3,718
All Active Projects
1,769
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2023

March 1, 2023

img_map_placeholder

1210 Polett Walk, Philadelphia, PA

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.