Published March 9, 2023 at 7:00 PM

Updated January 26, 2024

Site work and new construction of a water / sewer project in Clinton, Iowa. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

As of March 9th, 2023 this project is pending an award decision. Project No: 39846 ENGINEERS ESTIMATE: $ 5,500,000 Question Cuttoff Date & Time 2/1/2023 03:00:00 PM (ET) Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. David J. Haugen Veenstra & Kimm, Inc. dhaugen@v-k.net 319.382.9327 Construct wastewater submersible pump station including all labor, materials, and equipment necessary for excavation, backfill, and site work; reinforced concrete; site piping; manholes; submersible pumps; prefabricated control building with electrical and control equipment including conduit, cables, wiring, motor controls, starters, switches, fixtures, generator, and transfer switch; metering manhole and associated work, including cleanup The location of the work to be done and the kinds and sizes of materials proposed to be used are as follows Construct wastewater submersible pump station including all labor, materials, and equipment necessary for excavation, backfill, and site work; reinforced concrete; site piping; manholes; submersible pumps; prefabricated control building with electrical and control equipment including conduit, cables, wiring, motor controls, starters, switches, fixtures, generator, and transfer switch; metering manhole and associated work, including cleanup. BID SECURITY: Certified check, cashier's check, certified share draft or bid bond in the amount of five percent (5%) of the bid. Bidders shall use the bid bond form bound in the specifications. COMPLETION DATE: All work on the contract shall be: Substantial Completion - May 30, 2024 Final Completion June 30, 2024 DIRECT QUESTIONS TO: Mark A. Seip, Veenstra & Kimm, Inc. 515-225-8000 mseip@v-k.net

Bid Results

Water / Sewer

$4,578,000.00

Public - City

New Construction, Site Work

33

18

29

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
97
Bidding Soon
1,158
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2023

March 1, 2023

Project location map

4025 S 30th St, Clinton, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.