EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 6, 2023 at 7:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Spartanburg, South Carolina. Completed plans call for site work for a transportation facility; and water / sewer project.

The work will consist of erosion repairs located on the 23-end of the Runway, removal and replacement of storm drainage pipe and structures, modifications to existing storm drainage inlets, gravel access road removal, regrading and relocation, modifications to an existing detention area structure and grassing. Each proposal shall be accompanied by a cash deposit or certified check, drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation, in an amount equal to not less than five percent of the proposal. In lieu thereof, the bidder may offer a bid bond of five percent of the bid prepared on the Bid Bond form contained within the Contract Documents or a Surety Companys Standard Bid Bond form, duly executed by the Bidder as principal and executed by a surety company licensed under the laws of South Carolina to execute such bonds and listed in the latest issue of U. S. Treasury Circular 570, conditioned that the surety will, upon demand, forthwith make payment to the obligee upon said bond if the bidder fails to execute the contract in accordance with the bid bond. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 90 days. Bidders must comply with the Presidents Executive Order No. 11246, as amended, which prohibits discrimination in employment regarding race, creed, color, sex, or national origin. The Contractor shall comply with the Department of Labor Safety and Health Regulations for construction promulgated under the Occupational Safety and Health Act of 1970 (PL91-596) and under Section 107 of the Contract Work Hours and Safety Standards Act (PL91-54), or latest revisions. All Equipment/Manufacturer Or-Equal Qualification Packages, per the Instructions to Bidders (Document 00 21 13), must be submitted at least ten days prior to the advertised bid date. The Owner reserves the right to reject any or all bids and to waive informalities and technicalities.

Post-Bid

Transportation Terminals

$200,000.00

Public - City

Site Work

10

8

8

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Protecting Installed Construction, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
86
Bidding Soon
1,076
All Active Projects
554
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2023

February 6, 2023

img_map_placeholder

500 Ammons Rd, Spartanburg, SC

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Runway End 23 Erosion Repair

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.