Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and addition to an educational facility in Payson, Illinois. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.
Technical questions regarding interpretations of the bidding documents shall be directed to Amanda Springer - aspringer @klingner.com of Klingner & Associates PC and NOT City Blue Technologies. Bids shall be accompanied by a Bid Bond in the sum of 5% of the total base bid A certified check or bank draft, payable to the order of the Payson CUSD No. 1 equal to this amount will be an acceptable Bid Bond. Bids shall be accompanied by a Bid Bond in the sum of 5% of the total base bid A certified check or bank draft, payable to the order of the Payson CUSD No. 1 equal to this amount will be an acceptable Bid Bond. Pursuant to Section 10-20.21 of the School Code, awards will be made to the lowest responsible bidder as reasonably determined by the Board of Education considering conformity with specifications, terms of delivery, quality and serviceability. In evaluating these factors, the Board will necessarily consider and compare (relative to the other bidders) the experience of the bidder on this type of project or similar projects, AND the performance history of the bidder regarding conformity with specifications, meeting terms of delivery and quality of work AND the performance history and ability of the bidder to complete the project on time, to service the product (including response time to service calls) and workmanship on the project. The board of education is not obligated to accept the lowest dollar bid and reserves the right to reject any and all bids or to waive any informalities, irregularities, technicalities, or de- fects in any bid should the board deem it in the best interest of the school district to do so. Awards, if made, will be made within sixty (60) days following the opening of these bids. Labor Statutes, Prevailing Wage Rates - In the employment and use of labor, contractors will be required to conform to all Illinois statutory requirements regarding labor and to pay not less than the prevailing rate of wages for all classifications of labor as determined by the Illinois Department of Labor. Prevailing wages are subject to change. Prospective bidders must comply with 30 Illinois Compiled Statutes 570 et seq. regarding preference to Illinois citizens or public works projects. The bidder shall comply with the applicable provisions of the Illinois Human Rights Act specifically including but not limited to the requirement of 775 ILCS 5/2-105 that every bidder shall have a written sexual harassment policy in place including at a minimum those requirements of such statutory provision.
Post-Bid
Educational
$200,000.00
Public - City
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 7, 2022
January 6, 2023
420 W Brainard St, Payson, IL
Related To This Project
Payson, IL
Bid Date: Apr 26 2022
Payson, IL
Bid Date: Aug 09 2022
Payson, IL
Bid Date: Feb 14 2023
Kankakee, IL
Bid Date: Jan 19 2023
Holiday Shores, IL
Bid Date: Dec 06 2022
Rockford, IL
Bid Date: Jan 06 2023
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Roseville, IL
Bid Date: Dec 07 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.