BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Streeter, North Dakota. Completed plans call for the renovation of a educational facility; and laboratory facility.

For North Dakota State University Central Grasslands Research Extension Center, located at 4824 48th Ave SE Streeter, ND 58483 Project will consist of multi prime contracts or a combined contract: a. General Construction b. Electrical Construction c. Mechanical Construction d. Combined General, Electrical and Mechanical Construction Drawings and specifications prepared by ICON Architectural Group, LLC and their consultants may be seen and examined at the Architect's office electronically Bidders may request digital copies of the construction documents including addendums by contacting Laura Kendall at ICON Architectural Group at (701) 772-4266 or by contacting Kevin Sedivec at NDSU Central Grasslands REC at (701) 424-3606 Each bid shall be accompanied by a separate envelope containing a Bidder's Bond in a sum equal to five percent (5%) of the full amount of the bid, including all add alternates, executed by the bidder as principal and by a Surety Company authorized to do business in this state, conditioned that if the principal's bid be accepted and the contract awarded to him, he, within ten days after notice of award, will execute and effect a contract in accordance with the terms of his bid and a Contractor's Bond as required by law and the regulations and determinations of the governing board. Cash, cashier's check, or certified checks will not be accepted. A copy of the contractor's license or certificate of renewal thereof issued by the Secretary of State shall be enclosed in the required bid bond envelope. Envelopes shall be identified as to contents and project. All bidders must be licensed for the highest amount of their bids as provided by Section 43 07 05 of the North Dakota Century Code. No bid will be read or considered which does not fully comply with the above provisions as to bond and licenses and any deficient bid submitted will be re sealed and returned to the bidder immediately. The Owner reserves the right to waive any informalities or irregularities, to reject any and all bids and to hold all bids for a period of 30 days after the date fixed for the opening thereof. Anticipated date is January 19th, 2023. Construction substantially completed December 1st,2023 unless otherwise agreed upon. Bid results - Genreal - Tooz Construction - $979,979.00 Electrical - Western Edge Electrical - $116,900.00

Bid Results

Educational

$1,089,979.00

Public - State/Provincial

Renovation

48

22

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
54
All Active Projects
17
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2022

January 19, 2023

img_map_placeholder

4824 48th Ave SE, Streeter, ND

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.