Site work for a communication facility in Bremerton, Washington. Completed plans call for site work for a communication facility.
For Anderson Hill Fiber Project Bids are being asked for provision of all necessary labor, equipment and materials required for the installation of the District provided fiber cables from the existing District splice case on Seabeck Hwy NW along NW Anderson Hill Rd to existing splice case on Old Frontier Rd using the strand and lash construction methods along PSE poles, installation of conduit in Kitsap ROW and proof and pull of fiber through existing conduit Point of contact for questions is Jim LeCompte, Telecom Outside Plant Engineer of KPUD at telecombid@kpud.org. A bid bond is required with this project. Cash, checks or money orders will not be accepted. Performance Bond and a Payment Bond will be required by the successful bidder. As a small works project all applicable requirements of a normal small works project are in full effect including, but not limited to: prevailing wage, insurance requirements, maintenance bonds and compliance of all Labor and Industry requirements. When submitting a bid, only include the bid form, the bid bond and the Non-Collusion certificate. Other forms included in the Standard Construction Specifications are for reference and to be used during the award and performance of the contract. Upon completion of the project, Contractor shall invoice the District for final payment. District will process the final payment upon receipt of Affidavit of Wages Paid (from Washington State Department of Labor and Industries) and execution of the Maintenance Bond/Assignment of Account. The District has obtained the PSE Attachment Permit and in process with WSDOT Permit. All other permits if any are the Contractors responsibility. The Contract will be awarded to the qualified bidder submitting the lowest responsible bid. Kitsap PUD reserves the right to reject any or all bids and to waive all informalities in the bidding. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. The following subsection will be added as follows: All work and materials and equipment shall be and is guaranteed by the Contractor for a period of two years from and after the date of final acceptance. Upon completion of construction and prior to final acceptance by the PUD, the Contractor shall furnish to the PUD a maintenance bond in an amount determined by the PUD but not less than 10% of the total project construction cost (including sales tax). The Contractor shall provide the PUD with documentation of the total construction costs and these costs shall be approved by the PUD for the purpose of setting the bond amount. If within said guarantee period, repairs or changes are required in connection with guaranteed work, which, in the opinion of the Engineer or Kitsap PUD, is rendered necessary as the result of the use of materials, equipment or workmanship which are inferior, defective, or not per the terms of the contract, the Contractor shall, promptly upon receipt of notice from the Owner, and without expense to the Owner (a) place in satisfactory condition in every particular all of such guaranteed work, correct all defects therein; and (b) make good all damage to the building or site, or equipment or contents thereof, which in the opinion of the Engineer, is the result of the use of materials, equipment or workmanship which are inferior, defective, or not per the terms of the contract; and (c) make good any work or material, or the equipment and contents of building, structure or site disturbed in fulfilling any such guarantee This project requires the installation of the District provided fiber cables from the existing District splice case on Seabeck Hwy NW along NW Anderson Hill Rd to existing splice case on Old Frontier Rd using the strand and lash construction methods along PSE poles, installation of conduit in Kitsap ROW and proof and pull of fiber through existing conduit
Award
Communication
$58,750.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 7, 2022
February 6, 2023
Multiple Locations, Bremerton, WA
Related To This Project
Bremerton, WA
Bid Date: Jun 05 2019
Bremerton, WA
Bid Date: Dec 14 2022
Bremerton, WA
Bid Date: Mar 29 2022
Bremerton, WA
Bid Date: Mar 25 2022
Bremerton, WA
Bid Date: Mar 15 2022
Bremerton, WA
--
Bremerton, WA
Bid Date: Jun 08 2023
Bremerton, WA
Bid Date: Dec 21 2022
Bremerton, WA
Bid Date: Oct 28 2022
Bremerton, WA
Bid Date: Oct 28 2022
Bremerton, WA
Bid Date: Oct 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.