Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a pre-engineered storage facility in Chapin, South Carolina. Working plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
Public Works Substation at Fairview - Pole Building All inquiries concerning this RFP should be directed to: Melissa M. Chappell Procurement Manager County of Lexington Phone: 803-785-8319 Fax: 803-785-2240 Email: mchappell@lex-co.com Question Deadline Apr 03, 2023 at 12:00 PM SCOPE OF WORK Specifications - Pre-Engineered Post-Frame Building (Item 1) GENERAL A. Provide equipment, materials, and labor necessary for the complete construction of one (1) Pre-Engineered Post-Frame building to be constructed on site at the County of Lexington's Public Works property in Fairview, South Carolina. B. South Carolina Sales Tax: The successful contractor shall pay all applicable South Carolina sales tax. C. All materials shall be guaranteed as specified. All work to be completed in a skillful and competent manner according to standard practices. D. The successful contractor shall exercise every precaution to prevent injury to persons, damage to property while performing work and shall complete the construction work within OSHA regulations. E. The successful contractor is responsible for all necessary building permits. SITE WORK A. The County of Lexington is responsible for all necessary grading and site prep. FRAMING A. The design of the pre-engineered building shall be the same as Chapin with a 10-foot extension in both directions, shall be a wood frame structure with single ply clear span roof trusses. The building shall be designed in accordance with the latest edition of the International Building Code. Basic design loads will include live wind and dead loads. Framed openings shall be designed to structurally replace the wall covering and framing they displace. B. Exterior steel siding and roofing shall be 26 gauge structural quality full hardened galvanized steel, with a thirty (30) year limited warranty by the manufacturer on the steel. Steel siding and roofing will be cold rolled galvanized steel with a baked-on finish. All steel siding, top and bottom shall be painted unless otherwise specified. All fasteners are color coded to match panels. C. For the foundation, a 6" x 6" #2 yellow pine post, treated with CCA to a .6 lb. pcf. Retention (tested by the American Wood Preserves for in-ground contact) shall be used. Posts shall be set 4' in the ground on a 5" x 12" x 12"pre-cast concrete pad. D. Flashing, closures and/or trim shall be furnished at rake (end), eaves (sides), comers, framed openings, and wherever necessary to provide weather-tightness and a finished appearance. E. Insulation, where specified, shall consist of a minimum rating of R-7 with an Underwriters Laboratory approved flame spread rating of 25. Building shall be fully insulated. F. Framing shall be similar to the Chapin office and must pass all County of Lexington inspections.
Final Planning
Warehouse / Distribution - Pre-Engineered Storage Building
$240,000.00
Public - County
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2023
May 10, 2023
199 Murray Lindler Rd, Chapin, SC
Related To This Project
Chapin, SC
Bid Date: Feb 02 2022
Chapin, SC
Bid Date: May 26 2022
Chapin, SC
Bid Date: Jul 28 2022
Chapin, SC
Bid Date: Sep 09 2022
Chapin, SC
Bid Date: Sep 28 2022
Chapin, SC
--
Chapin, SC
Bid Date: Mar 01 2023
Chapin, SC
Bid Date: Mar 16 2023
Chapin, SC
Bid Date: Dec 01 2022
Chapin, SC
Bid Date: Jan 05 2023
Charleston, SC
Bid Date: Nov 25 2022
Eastover, SC
Bid Date: Aug 25 2023
Spartanburg, SC
Bid Date: Jan 05 2023
Georgetown, SC
Bid Date: Dec 14 2022
Georgetown, SC
Bid Date: Dec 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.