BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 27, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a civil project in Woodville, Florida. Completed plans call for site work for a water / sewer project; and water / sewer project.

** As of January 24, 2023 this project has not yet been awarded. A timeline or award has not yet been established.** The general scope of services for the work will include, but not be limited to furnishing of all labor, equipment and materials for construction of a master pump station, master force main, grinder pumps, and new gravity sewers main pipes and associated service laterals with cleanouts, force mains, concrete manholes in the existing public road right of ways or utility easements and roadway reconstruction or restoration. The Woodville Master Pump Station and Force Main connection to the existing City of Tallahassee sewage collection system location is at the Marpan Industrial Park. Also, performing residential and commercial sewer lateral connections using 4-inch and 6-inch PVC pipe and drinking water service connections throughout the confines of the Phase 1A Project Area. Upon connecting these new sewers to residential or commercial lots, their existing septic tanks & drain fields shall be pumped out, collapsed, backfilled, and abandoned in-place, to include some with drinking water connections and related drinking water well abandonment. All existing road and storm structures that are removed for sewer lines shall be replaced and the road surfaces restored by resurfacing. All disturbed unpaved land shall be re-graded, sodded and watered to establish growth. This Woodville area is known for Karst geological conditions which includes challenging limestone and sinkhole opportunities in this construction, so Contractors should make themselves aware of these subsurface conditions. Work includes coordination with City Utilities, County Building Officials, permit agencies, testing labs, etc. Question Submission Deadline: December 20, 2022, 5:00pm

Award

Water / Sewer

$14,453,759.00

Public - County

Site Work

283

13

10

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
35
Bidding Soon
527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2023

February 13, 2023

Project location map

Multiple Locations, Woodville, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.