BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Bernardino, California. Completed plans call for site work for a water / sewer project.

work under this Contract is the ENHANCED RECHARGE IN THE SANTA ANA RIVER BASINS - PHASE 1B. Contractor shall furnish all labor, equipment and materials to construct: Recharge Basins: Two new groups of recharge basins (A and B) (total of 20 basins) will be constructed to provide additional recharge capacity for the project. Channel Extension: Approximately 7,000 feet of new earthen rip rap lined channel to convey water to the proposed new recharge basins. Access roads. Concrete Structures: Proposed concrete structures include, but not limited to: a) Drop structures b) Channel to basin weir structures c) Inter-basin structures d) Concrete aprons to mitigate scour within the recharge basins e) Concrete channel section across the MWD easement limits f) Concrete diversion structure to send water to Dike D Channel to Basin Piping: Construction of 48-inch diameters reinforced concrete pipes (RCP) from the concrete diversion structures in the channel to the recharge basins. Inter-Basin and Outlet Piping: Construction of 48-inch diameter reinforced concrete pipes (RCP) inter-basin and outlet piping. Modification of Existing Recharge Basins: Construction of inter-basin and outlet piping and concrete structures through existing berms including 48-inch diameter reinforced concrete pipes (RCP). Culvert consisting of five pipes with upstream and downstream concrete headwalls and approach slab to cross the existing East Valley MWD Well 125 Pipeline. Instrumentation and Controls including solar panels, batteries, RTU, antennas, pressure transducers, conduits and wiring. For purposes of obtaining a Bid Bond, the Engineers Estimate is between $60,000,000 and $80,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions regarding the project must be submitted on the bidders Question Form provided and transmitted by email to BIDQ@SBVMWD.COM no later than 5:00 p.m. on January 5, 2023. Any bidder is required to hold a Class A Contractors License at the time the contract is awarded. Any bidder or Contractor not so licensed shall be subject to all legal penalties imposed by law, including but not limited to, any appropriate disciplinary action by the Contractors State License Board. Failure of the bidder to obtain proper and adequate licensing prior to an award of a contract shall constitute a failure to execute the contract and shall result in the forfeiture of the Bid Bond or check. The district hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. MBE (19%), WBE (6.9%) Completion- (920) calendar days

Award

Water / Sewer

$80,000,000.00

Public - City

Site Work

169

21

23

7

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
91
Bidding Soon
2,165
All Active Projects
972
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2023

April 10, 2023

img_map_placeholder

Multiple Locations, San Bernardino, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.