BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a transportation facility in Chicago, Illinois. Completed plans call for the renovation of a transportation facility.

Contractor shall, as an independent contractor and not as an agent of METRA, provide all permits, labor, tools, equipment, insurance, transportation, and facilities, etc. necessary for Construction Services for Fox Lake Cable Reels, electrical switchgear and components. Questions Due Date: Mar 30th 2023, 4:00 PM CDT Intent to Bid Due Date: May 1st 2023, 2:00 PM CDT PERIOD OF PERFORMANCE. The Contractor shall complete the work within a duration period of 275 days which starts from the award date (not the notice to proceed date) of this Contract. Actual work cannot begin until receipt of a written notice to proceed is given by Metra. A Notice to Proceed will be issued once the Contractor has submitted and Metra has approved the Contractor's necessary bonds, insurance, DBE subcontracts (if applicable) and Illinois Works Apprenticeship Initiative Certification. In addition, the Contractor must submit its approved Federal Railroad Administration (FRA) Control of Alcohol and Drug Use (49 CFR Part 219) Railroad Contractor Compliance Plan along with the FRA's written approval of the Contractor's plan. Metra also reserves the right to terminate the contract if these documents are not submitted to and approved by Metra within 30 days from the award date of the contract. PROGRESS PAYMENTS. Contractor shall submit certified estimates to Metra on or about the first day of each month during the progress of the work. Metra will pay on or about thirty (30) days from receipt of the certified estimates for the work installed per Metra's standard pay request application form. Ten percent (10%) of the cost of the work will be retained until such time as 80% work provided for in this Contract is completed and accepted. The retainage will be reduced to 5% upon completion and acceptance of 80% of the work.

Award

Transportation Terminals

$4,213,000.00

Public - City

Renovation

32

13

13

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
125
Bidding Soon
1,878
All Active Projects
831
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.