Published February 27, 2024 at 7:00 PM

Updated July 4, 2024

Site work for a bridge / tunnel in Toronto, Ontario. Completed plans call for site work for a bridge / tunnel.

The scope of work includes three kilometres of twin tunnels under Pape Avenue from the Gerrard portal to the Don Valley bridge; two tunnel portals at Gerrard Avenue and Minton Place; one underground station at Pape Avenue and Danforth Avenue (interchange with the TTC's existing Pape Station on Line 2) and another underground station at Cosburn Avenue and Pape Avenue; three emergency exit/service buildings; underpinning of the existing TTC Pape Station; and a rail switch/crossover in the tunnel near Sammon Avenue. Infrastructure Ontario (IO) and Metrolinx have issued Requests for Proposals (RFP) for two major works packages for the Ontario Line: Pape Tunnel and Underground Stations and the Elevated Guideway and Stations contracts. January 17, 2024 As of January 2024 Infrastructure Ontario and Metrolinx have selected Pape North Connect to deliver the Ontario Line Pape Tunnel and Underground Stations contract. The team has signed a Development and Master Construction Agreement (DMCA) with Metrolinx, under a progressive design-build contract. The Pape North Connect team includes: Applicant Leads: Webuild Civil Work Inc., Fomento de Construcciones y Contratas (FCC) Canada Ltd. Design Team: Arcadis Professional Services (Canada) Inc., AECOM Canada Ltd. Construction Team: Webuild Civil Work Inc., Fomento de Construcciones y Contratas (FCC) Canada Ltd. The team was selected following an evaluation of proposals submitted in September 2023. The selection of Pape North Connect is the result of an open, fair and competitive procurement process overseen by a third-party fairness monitor. The DMCA incorporates a multi-stage design process called a development phase, according to the progressive design-build model. This phase allows for a collaborative approach between Metrolinx as the project owner and Pape North Connect as the contracting partner, who work together to finalize the scope, risk allocation and pricing of various elements of this contract. The development phase is anticipated to take approximately 24 months, though early works construction can commence during this phase. Once the development phase has concluded, Metrolinx will have the option to sign a final target-price agreement with Pape North Connect, which would include final agreements on detailed designs and a negotiated price. The Ontario Line project is being delivered through various public-private partnership (P3), progressive design-build and traditional procurement contracts, which are all being staged accordingly for their successful delivery.

Award

Bridges / Tunnels

$50,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
273
Bidding Soon
4,962
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2023

February 1, 2024

Project location map

Multiple Locations, Toronto, ON


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.