BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction, renovation and addition to an educational facility in Lincoln, Nebraska. Completed plans call for the addition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The Whiting-Turner Contracting Co. has been selected as Construction Manager for Phase 2 of Architecture Hall Renovation and Addition. Whiting-Turner is inviting your firm to provide a proposal for the following bid packages for Architectural Hall Phase 2 based on the information outlined below. It is Whiting-Turners intent to select the most qualified partner who will best fit the project team. Your proposal should include a Complete package to meet the intended design as outlined below and depicted in the drawings, specifications, and all supplemental documents provided. Please clarify any assumptions that you make while preparing your proposal. Your company will be contractually tied to your bid amount barring any major scope changes. This project is tax-exempt and will require a payment and performance bond. Whiting-Turner intends to receive proposals and award contracts based HDRs Design Development Package for the following scopes of work: Steel Fabrication - Division 05 Steel Erection - Division 05 Roofing - 07 53 25 Glass & Glazing - 08 81 23 & 08 81 26 Fiberglass Sandwich Panel Assemblies & Metal Panel Systems - 07 42 16 & 08 45 23 Framing, Drywall & Exterior STO system - Division Fire Suppression - Division 21 The rest of the scopes of work will be released for bidding when we receive the final construction documents. In the meantime, Whiting-Turner would greatly appreciate budget proposals from all other scopes not listed above. (Demolition, Excavation, Concrete, Mass Timber, Mechanical & Electrical were in separate bid packages) In order to be given consideration, any questions or requests for bid interpretation must be received by The Whiting Turner Contracting Company no later than 12/2/2022 12:00:00 PM (CT). Questions must be submitted directly to: matt.schulte@whiting-turner.com.

Post-Bid

Educational

$500,000.00

Public - State/Provincial

Addition, New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
34
Bidding Soon
486
All Active Projects
197
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2022

January 6, 2023

img_map_placeholder

402 Stadium Dr, Lincoln, NE

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.