EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 8, 2023 at 7:00 PM

Updated October 1, 2024

Site work, new construction and renovation of a water / sewer project in Salem, Ohio. Completed plans call for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

An award could be made at the next board meeting on February 13, 2023. Contract A - Complete Plant Each bid must contain the full names of the party or parties making the same, with an affidavit as to interested parties, and in the case of a corporation not chartered in Ohio, with a proper certificate that such corporation is authorized to do business in Ohio, and shall be accompanied by a Bid Guaranty Bond for the full amount (100%) of the Bid, in favor of the City of Salem, Ohio or a certified check, cashier s check, or surety bond in the amount of 5% of the Bid, payable to the City of Salem, Ohio. It is agreed that the bid guaranty shall be for the benefit of the City pursuant to Section 153.54 of the Ohio Revised Code if the undersigned fails to execute the Contract in conformity with the Form of Contract incorporated in the contract documents and furnish Bond and insurance certificates within ten (10) days after the notification of the award of the Contract to the undersigned. The work covered by the Contract Documents includes the following: Contract A Complete Plant The proposed work consists of the partial rehabilitation of three (3) trickling filters, removal and replacement of four (4) trickling filter pumps, removal and replacement of one (1) digester cover, a new digester mixing system, one new sludge thermochemical hydrolysis process (including sodium hydroxide storage and feed system, reactor tank, heat exchanger, boiler, sludge blend tank and progressive cavity pumps), a new sludge conditioning building, a new dewatering building, with one (1) new centrifuge, a new sludge dryer, a new combined heat and power (CHP) unit, a new diesel-powered generator with new switchgear, and all associated civil, HVAC, plumbing, electrical and instrumentation improvements. ADD ALTERNATE work items, as noted on the Drawings and in 00 24 01.16 and 00 41 00.01 of the Specifications, may be determined to be non-performed once Bids have been opened. Prospective BIDDERS may address written inquiries to: Mr. Todd Taylor, PE at Burgess & Niple, Inc., Akron Centre Plaza 50 South Main Street Suite 600 Akron, Ohio 44308 Phone: (330) 376-5778 Email: Todd.Taylor@BurgessNiple.com Prospective bidders are permitted to visit the wastewater treatment plant during the bidding period. All visits shall be coordinated with Mr. Dean Stokes, Wastewater Treatment Plant Manager at phone number (330) 332-9770. The Salem Wastewater Treatment Plant is located at 1600 Pennsylvania Ave, Salem, Ohio 44460. Attention to the BIDDERS is called to the Instructions to Bidders, which are included in the proposed Contract Documents. Successful BIDDER shall be required to comply with all laws pertaining to minimum wage and discrimination of persons. All bids must be signed and submitted on the blanks provided in the Bid book. Each bidder must submit evidence of its experiences on projects of similar size and complexity. All contractors and subcontractors involved with the project will, to the extent practicable use Ohio Products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the Equal Employment Opportunity Requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and Governor s Executive Order 84-9 shall be required. Bidders must comply with all contract provisions for projects receiving Federal aid including, but not limited to, the provisions of Executive Orders 11246 and 11375 and the Davis-Bacon Act as amended. Davis-Bacon Prevailing Wage Determinations must be used in addition to any state prevailing wage rates required by Ohio state law. Guidance on American Iron and Steel Provisions as specified in HR #3547 apply to this project. All material, items, and appurtenances supplied and installed on this contract shall be manufactured in the U.S.A. unless contractor can demonstrate the items are not available in U.S.A. This procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRAs). EEO, DBE, Debarment and other requirements for projects funded through the Ohio EPA WPCLF Account are defined in the Documents and must be complied with the Salem Utilities Commission, City of Salem, Ohio reserves the right to reject any and all bids, to waive any informalities in the bids received, and to accept any bid which it deems most favorable. The City of Salem is an Equal Opportunity Employer and does not discriminate against the handicapped.

Post-Bid

Water / Sewer

$14,700,000.00

Public - City

New Construction, Renovation, Site Work

166

37

35

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Fabricator Qualifications, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Accessories, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings, Pipe and Tube Railings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Thermal Protection, Thermal Insulation, Vapor Retarders, Roofing and Siding Panels, Membrane Roofing, Built-Up Bituminous Roofing, Built-Up Asphalt Roofing, Fire and Smoke Protection, Firestopping, Joint Protection
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Curtain Wall and Glazed Assemblies, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Terrazzo Flooring, Carpeting, Painting and Coating, Painting, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Fireplaces and Stoves, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools, Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Heating Boilers, Cast-Iron Boilers, Fuel-Fired Heaters, Heat Exchangers for HVAC, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Electrical Power Monitoring and Control, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Motor-Control Centers, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Power Filters and Conditioners, Capacitors, Power Factor Correction Equipment, Voltage Regulators, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Fine Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Aggregate Surfacing, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Sprigging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Common Work Results for Process Piping, Common Work Results for Process Valves, Gas and Vapor Process Piping, Process Piping and Equipment Protection, Process Piping and Equipment Insulation, Process Piping Insulation, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Screw Bulk Material Conveyors, Manufacturing Equipment, Machining Equipment, Grinding Equipment, Finishing Equipment, Grinding Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps, Liquid Handling Equipment, Gas and Liquid Purification Equipment, Gas and Liquid Purification Process Equipment, Chemical Feed Systems
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
147
Bidding Soon
1,407
All Active Projects
664
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2023

March 28, 2023

img_map_placeholder

1600 Pennsylvania Ave, Salem, OH

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Salem Waste Water Treatment Plant Phase 3 Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.