BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2023 at 7:00 PM

Updated January 25, 2024

Site work for a mixed-use development in Saint Louis, Missouri. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

The 2023 Deer Creek Field Flood Restoration consists of skinned infields and sand volleyball court removal and replacement, one backstop replacement, other backstops and fencing repair, renovate turf areas, clear and repair/replace surface drains and stormwater pipes. The Work to be performed under the Contract shall commence within ten (10) days of the date of the written notice to proceed from the City to the Contractor and shall be completed within 75 consecutive calendar days from and including the date of said written notice to proceed.

Award

Playgrounds / Parks / Athletic Fields

$171,524.00

Public - City

Site Work

11

7

6

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
95
Bidding Soon
1,253
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2023

February 13, 2023

Project location map

Deer Creek Trail, Saint Louis, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.