BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Gatineau, Quebec. Contact the soliciting agency for additional information.

Reference Number 0000236997 Source ID PU.DP.Que..8088.29965.C1018327 Bid Intent Not Available Question Acceptance Deadline Dec 15, 2022 02:00 PM EST Questions are submitted online Yes The proposed project is a study to investigate the feasibility to decarbonize (eliminate GHG emissions of) the PDP III parking garage. Following the Project GHG Options Analysis Methodology, the consultant shall investigate different solutions to decarbonize the parking garage. In addition to the guideline, the developed solutions will need to account for/solve other factors i.e but not limited to: end of life of equipment, operational challenges (lighting fixture integrity and control or other), electrical capacity and other ongoing projects. If applicable, the consultant will identify and support BGIS in any applicable incentive program for feasibility study (i.e Hydro Quebec) and identify/cost potential incentives for the decarbonization program that will follow. Event Type pre-registration Attendance Mandatory Event date Dec 06, 2022 02:00 PM EST Location chady.moussa@bgis.com Event Note Proponents are advised that they MUST pre-register via email to Chady.Moussa@bgis.com before December 6th at 2pm EST to be authorized to access the site. Failure to pre-register will result in the Proponent's Representative being refused access to the site. BGIS will contact all Proponents that register and confirm the site visit time in the case when there are multiple site visit times. A maximum of one representative of each Proponent, or its authorized representative, are permitted to attend the site visit. BGIS will contact all Bidders that register and confirm the site visit time in the case when there are multiple site visit times. All individuals attending the site visit must bring their Protective Equipment (PPE) such as safety shoes/boots, safety vests, hard hats, safety glasses, etc. Individuals without the appropriate PPE will not be permitted to access the site. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform. The method of contractor selection has not been determined at this time.

Conceptual

Municipal

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
47
Bidding Soon
648
All Active Projects
231
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2023

img_map_placeholder

11 Rue Laurier, Gatineau, QC

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.