BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2022 at 7:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Utica, Michigan. Completed plans call for the renovation of a 125,000-square-foot educational facility.

1. UCS BID ADVERTISEMENT - 2023 ROOF REPLACEMENT DESCRIPTION: Remove and Replace Designated Roofs at Eisenhower High School and Henry Ford II High School Each proposal must be accompanied by a Bid Security in the amount of five percent (5%) of the base proposal executed by an approved Surety Company or a certified check for the same amount made payable to Utica Community Schools. The bid security shall remain in effect for a period of sixty (60) days from date of bid opening. The bid bond or check delivery is conditioned to secure Utica Community Schools from loss or damage by reason of the withdrawal of the bid or by the failure of the bidder to enter a contract for performance if the bid is accepted by the Owner. Bidders may not alter, withdraw or cancel their bid or any part thereof for sixty (60) days after the time designated for receipt of the bids stated above. Successful bidders will be required to provide Payment and Performance Bonds in the amount of 100% of their bid, issued by sureties listed by the U.S. Treasury Department and licensed to do business in Michigan. The Owner reserves the right to accept or reject any total bid, or part thereof, and to award the total contract or part thereof to other than the low bidder. All decisions regarding contract awards will be final. SCHEDULE: The roofing work for the replacement projects must be accomplished during the summer break of 2023. REQUIRED ATTACHMENTS TO BID: 1) FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT All bids shall be accompanied by a sworn statement disclosing any familial relationship that exists between the owner(s) or any employee of the bidder and any member of the Board of Education of the School District or the Superintendent of the School District. 2) AFFIDAVIT OF COMPLIANCE - IRAN ECONOMIC SANCTIONS ACT Michigan Public Act No. 517 of 2012 All bids shall be accompanied by the above Affidavit of Compliance filled out in its entirety. The Board of Education shall not accept a bid that does not include the above two sworn and notarized attachments. PROJECTS 1) Eisenhower High School Roof Areas A, A1, B, B1, B2, and E 6500 25 Mile Rd, Shelby Twp, MI 48316 Approximate square feet of roof replacement: 53,000 2) Henry Ford II High School Roof Area I 11911 Clinton River Rd, Sterling Heights, MI 48313 Approximate square feet of roof replacement: 72,000

Post-Bid

Educational

$400,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
131
Bidding Soon
2,236
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2022

January 13, 2023

Project location map

To Be Determined, Utica, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.