Published January 10, 2023 at 7:00 PM

Updated January 25, 2024

Site work and renovation of a water / sewer project in Aurora, Indiana. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The existing Hogan water distribution system shall be replaced and improved The failure or omission of any Bidder to do any of the forgoing shall in no way relieve any Bidder from any obligation with respect to its bid. The Bidder to whom work is awarded shall comply with all requirements of said Agency. Neither the United States nor any of its departments, agencies or employees is or will be a party to this Advertisement for Bids or any resulting contract(s). Overnight delivery via UPS or FedEx of the Bidding Documents shall only be made using recipient's billing account number. Bids from anyone not on the Issuing Office's Plan Holders List will be returned unopened. Bids shall be accompanied by a bid bond in an amount equal to five percent (5%) of the Bid to ensure the execution of the contract for which the bid is made. In case the Bid is not accepted, the bid bond will be returned to the Bidder, but if the Bid is accepted and the Bidder shall refuse or neglect to enter into a contract with the Owner within ten (10) days after the time it has been notified of the acceptance of its Bid, the said bid bond shall be forfeited to the Owner as liquidated damages for the failure to do so. Each Bid must be enclosed in a sealed envelope bearing the title of the Project, the name and address of Bidder. All Bids must be submitted on the bid forms as identified in the Contract Documents and Specifications. A conditional or qualified Bid will not be accepted. Award will be made to the low, responsive, and responsible Bidder as determined in the sole discretion of the Owner. Approved performance and payment bonds guaranteeing faithful and proper performance on the work and materials, to be executed by an acceptable surety company, will be required of the Successful Bidder at the time it executes the contract. The bonds will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. Bids shall be properly and completely executed on bid forms included in the Specifications. Bids shall include all information requested by Indiana Form 96 (latest revision) included with the Specifications. Under Section III of Form 96, the Bidder shall submit a financial statement. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder, fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein. No Bidder may withdraw its bid for a period of ninety (90) days after closing time scheduled for the receipt of bids. The Bidding Documents do provide for a liquidated damages clause to insure timely completion of the Project. The Owner reserves the right to accept any Bid, to reject any or all bids, to reject bids that do not meet the qualifications outlined in the Bidding Documents and/or to waive any formalities or irregularities in the bidding process or bids received where such acceptance, rejection or waiver is considered to be in the best interest of the Owner as determined by it in its sole discretion. The Owner further reserves the right to reject any Bid where evidence or information submitted by the Bidder does not satisfy the Owner that the Bidder is qualified to carry out the details of the Bidding Documents. The Owner further reserves the right to reject all bids should the Owner determine in its opinion, based on bids received, that the contemplated construction costs is not economically feasible. All requirements as indicated in the Bidding Documents shall be met by successful bidders. GRW Engineers, Inc. Project Administrator, Vee Carter, can be contacted at (317) 347-3650 or vcarter@grwinc.com for questions about ordering Bidding Documents. GRW Engineers, Inc. Project Manager, Joe Tierney, P.E., can be contacted at (317) 347-3650 or jtierney@grwinc.com for technical questions about this Project. Overnight delivery via UPS or FedEx of the Bidding Documents shall only be made using recipient's billing account number. Bids from anyone not on the Issuing Office's Plan Holders List will be returned unopened. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than 7 days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect

Award

Water / Sewer

$780,050.00

Public - City

Renovation, Site Work

15

14

5

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Joint Protection, Joint Sealants
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Lockers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
96
Bidding Soon
1,674
All Active Projects
705
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2022

February 20, 2023

img_map_placeholder

To Be Determined, Aurora, IN

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Water Distribution System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.