EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 3, 2024 at 7:00 PM

Updated December 4, 2024

Site work and new construction of a transportation facility in Buffalo, New York. Conceptual plans call for the construction of a 376,700-square-foot transportation facility; and for site work for a transportation facility.

As of December 3, 2024, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: In 2021, the ECHDC adopted a $150 million General Project Plan ("GPP") for nearly 200-acres of the Outer Harbor. The Phase 1 improvements, located north of the development site, are already underway at a cost of $43 million. ECHDC is seeking proposals from experienced real estate developers for the purchase and redevelopment of the building titled Terminal A and a portion of the adjacent land (See Appendix B), located at 901 Fuhrmann Boulevard along the Buffalo Outer Harbor in Buffalo, New York. Also included in the sale are nearby support buildings titled the Administration Building, Fire Pump House, and Blue Building. Each party that submits a response ("Proposal") to this Request for Proposal ("RFP") is referred to herein as a "Respondent", and the Respondent that is conditionally designated through this RFP process is referred to herein as the "Designated Developer." Terminal A is a steel-framed, CMU infilled and brick veneered structure that was constructed in 1930-1931. This approximately 370,000 square foot building is comprised of a high-bay storage area along the south side, first and second floor storage space, and an office area on the east end of the building. The building was designed by notable architect Albert Kahn for the Ford Motor Company. Terminal A was designated a local landmark in 2019. The support buildings are comprised of the following: Administration Building: 6,700 square feet steel framed, brick veneered structure that consists of a garage and storage area and office spaces. Fire Pump House: 370 square feet structure. Blue Building: 4,300 square feet metal framed garage. The lakefront property includes 1,720 linear feet of vertical seawall and approximately 4.2 acres of deep-water slip along the southern edge. Deadline for Submission of Questions January 6, 2023 Deadline for ESD to Respond to Questions January 20, 2023 Interviews (if necessary) June 2023 Announcement of Successful Bidder September 2023 All contacts/inquiries shall be made by email to the following address: TerminalARedev@esd.ny.gov The Method of Contractor Selection has not been determined at this time.

Conceptual

Transportation Terminals

$43,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Roof Windows and Skylights, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Carpeting, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
140
Bidding Soon
2,699
All Active Projects
1,120
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

img_map_placeholder

901 Fuhrmann Boulevard, Buffalo, NY

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

RFP Design - Terminal A Redevelopment

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.