Published July 18, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Albany, New York. Completed plans call for the renovation of a municipal facility.

As of May 4, 2023, the project has been awarded. A timeline for construction has not been confirmed. Rehabilitate 5th Floor - HVAC Work Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a bid security (i.e. certified check, bank check, or bid bond in the amount of $38,000 for C, $4,700 for H, $15,900 for P, and $23,300 for E). All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract estimated to be between $500,000 and $1,000,000 for C, between $50,000 and $100,000 for H, between $100,000 and $250,000 for P, and between $500,000 and $1,000,000 for E. Pursuant to State Finance Law 139-j and 139-k, this solicitation includes and imposes certain restrictions on communications between OGS D&C and a bidder during the procurement process. A bidder is restricted from making contacts from the earliest posting on the OGS website, in a newspaper of general circulation, or in the Contract Reporter, of written notice, advertisement or solicitation of offers, through final award and approval of the contract by OGS D&C and the Office of the State Comptroller ("Restricted Period") to other than designated staff, unlessit is a contact that isincluded among certain statutory exceptions set forth in State Finance Law 139-j(3)(a). Designated staff are Jessica Cook, Jessica Hoffman, and Pierre Alric in the Division of Contract Management, telephone (518) 474-0203, fax (518) 473-7862. OGS D&C employees are also required to obtain certain information when contacted during the restricted period and to make a determination of the responsibility of the bidder pursuant to these two statutes. Certain findings of nonresponsibility can result in rejection for contract award and in the event of two findings within a four-year period, the bidder is debarred from obtaining governmental Procurement Contracts MBE Goals C Trade: 15% E Trade: 5% H Trade: 0% P Trade: 8% WBE Goals C Trade: 15% E Trade: 5% H Trade: 0% P Trade: 8% SDVOB Goals C Trade: 6% E Trade: 3% H Trade: 0% P Trade: 3% Service-Disabled Veteran-Owned Set Aside: No The substantial completion date for this project is 241 days after the Agreement is approved by the Comptroller. As a condition of award, within 48 hours of receipt of the proposed Contract Agreement from the State, the apparent low bidder shall return the Contract Agreement to the State, properly executed, along with the Bondsif required by said Agreement. Low bidders who cannot meet these provisions may be subject to disqualification and forfeiture of the bid security. Phone the office of Eric Luft (518-573-1364) a minimum of 48 hours in advance of the date to provide the names of those who will attend the pre-bid site visit. Only contractors that schedule a visit at least 48 hours in advance will be allowed to participate in the pre-bid site visit. The Office of General Services reservesthe right to reject any or all bids. CR Number: 2092842 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Municipal

$109,202.00

Public - State/Provincial

Renovation

43

12

7

10

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Specialty Placed Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Educational and Scientific Equipment, Laboratory Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Duct Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Screening Devices
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
152
Bidding Soon
1,660
All Active Projects
752
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Rehabilitate 5th Floor - HVAC Work

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.