BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 18, 2023 at 7:00 PM

Updated June 4, 2025

Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work in this contract is for the Sanitary Sewer Phases 10 Rehabilitation for Harris County Fresh Water Supply District No. 61 located in Hasting Green Section 2 along the side of North Eldridge Parkway and the end of Lofty Pines Drive. The purpose of the project is to rehabilitate the three sanitary sewer lines that run from the end of Lofty Pines Drive to along North Eldridge across from the WWTP. After the sanitary lines are rehabilitated, the four manholes will also be rehabilitated using a Cured-in-Place liner. Pre-Installation Cleaning and Televising, All Depths and Diameters, Complete in Place Slipline existing 36-Inch DIP sanitary sewer line with proposed 30-Inch SDR17 HDPE pipe and fill annular space with cementitious grout. Rehabilitation of sanitary sewer manholes with Cured-in-Place liner, including rebuilding of benches and inverts, remove and replace frames and covers, raise sanitary sewer manholes, and grout exterior of sanitary manhole frame. Site Restoration, Including Removing and Replacing Concrete Sidewalks and Driveways, Damaged Turf, Plants, Shrubs, Fences, and Trees, as Required Removal and replacement of concrete pavement, including curb, gutter, and subgrade at all thicknesses as needed. Implementation of trench safety. Bypass Pumping if required. the question cut-off date and time will be extended to January 5, 2023, at 5:00 PM. Any questions received from now until that date and time will be answered in the addendum posted on January 6, 2023. This project was designed by Lockwood, Andrews & Newnam, Inc. (LAN). The construction phase engineering services on this project will also be conducted by LAN. Any questions regarding the project should be directed to Michael R. Baker, E.I.T., or Jake W. Kocurek, P.E. with LAN at (713) 266-6900

Bid Results

Water / Sewer

$348,160.00

Public - County

Paving, Site Work

14

16

9

12

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
375
Active Projects
202
Bidding Soon
3,476
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2023

February 9, 2023

Project location map

Multiple Locations, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.