Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Richmond, Texas. Completed plans call for site work for a water / sewer project.
TWE Project No. 21.14.181 / Report No. 124645 (Revision 1) The work to be performed under this contract consists of furnishing all materials, appurtenances, tools, equipment, labor and incidentals to construct improvements to Ditch B and Ditch B-1 generally described as follows: 1. Excavation and off-site disposal of soils associated with widening and deepening of Ditch B and Ditch B-1; 2. Implementing new pilot channel systems along the ditches (as shown in the drawings): a. A trapezoidal pilot channel armored with articulated concrete block; and b. A rectangular pilot channel comprised by a reinforced concrete retaining wall system. 3. Installation of reinforced concrete erosion protection at critical locations along the project reach; 4. Installation of a backslope swale system along both ditches; 5. Adjustment of existing City of Sugar Land storm sewer outfalls for connection to improved ditches; 6. Removal and replacement of two bridges associated with the golf cart traffic of Sweetwater Country Club (SWCC); 7. Installation of a reinforced concrete drop structure to lower the flowline of Ditch B near the confluence with Ditch A; and 8. Utilizing approximately 12,000 cy of excavated soils from Ditch B and Ditch B-1 to raise First Colony Levee Improvement Districts (FCLID) South Levee, as depicted within the construction drawings prepared by Costello, Inc. The deadline to ask questions is 1/06/2023 5:00 PM CST A geotechnical report has been uploaded as reference data for prospective bidders. Scope of Work of the Contract Documents includes the following: Excavation and disposal of soils associated with widening and deepening of Ditch B and Ditch B-1. Additional work items to include: implementing new pilot channel systems, installation of reinforced concrete erosion protection, installation of backslope swale systems, adjustment of City of Sugar Land storm sewer outfalls, removal and replacement of two golf cart bridges within Sweetwater Country Club, installation of a reinforced concrete drop structure to lower the flowline of Ditch B near the confluence with Ditch A, and utilizing excavated material to raise First Colony Levee Improvement District's South Levee.
Bid Results
Water / Sewer
$5,288,784.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 27, 2023
February 27, 2023
Multiple Locations, Richmond, TX
Related To This Project
Richmond, TX
Bid Date: Dec 20 2022
Richmond, TX
Bid Date: Jun 22 2021
Richmond, TX
Bid Date: Dec 08 2022
Richmond, TX
--
Richmond, TX
--
Richmond, TX
Bid Date: Dec 13 2022
Richmond, TX
Bid Date: Jan 10 2023
Richmond, TX
Bid Date: Jan 12 2023
Richmond, TX
Bid Date: Dec 20 2022
Richmond, TX
--
Richmond, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.