Site work for a water / sewer project in Richmond, Texas. Completed plans call for site work for a water / sewer project.

TWE Project No. 21.14.181 / Report No. 124645 (Revision 1) The work to be performed under this contract consists of furnishing all materials, appurtenances, tools, equipment, labor and incidentals to construct improvements to Ditch B and Ditch B-1 generally described as follows: 1. Excavation and off-site disposal of soils associated with widening and deepening of Ditch B and Ditch B-1; 2. Implementing new pilot channel systems along the ditches (as shown in the drawings): a. A trapezoidal pilot channel armored with articulated concrete block; and b. A rectangular pilot channel comprised by a reinforced concrete retaining wall system. 3. Installation of reinforced concrete erosion protection at critical locations along the project reach; 4. Installation of a backslope swale system along both ditches; 5. Adjustment of existing City of Sugar Land storm sewer outfalls for connection to improved ditches; 6. Removal and replacement of two bridges associated with the golf cart traffic of Sweetwater Country Club (SWCC); 7. Installation of a reinforced concrete drop structure to lower the flowline of Ditch B near the confluence with Ditch A; and 8. Utilizing approximately 12,000 cy of excavated soils from Ditch B and Ditch B-1 to raise First Colony Levee Improvement Districts (FCLID) South Levee, as depicted within the construction drawings prepared by Costello, Inc. The deadline to ask questions is 1/06/2023 5:00 PM CST A geotechnical report has been uploaded as reference data for prospective bidders. Scope of Work of the Contract Documents includes the following: Excavation and disposal of soils associated with widening and deepening of Ditch B and Ditch B-1. Additional work items to include: implementing new pilot channel systems, installation of reinforced concrete erosion protection, installation of backslope swale systems, adjustment of City of Sugar Land storm sewer outfalls, removal and replacement of two golf cart bridges within Sweetwater Country Club, installation of a reinforced concrete drop structure to lower the flowline of Ditch B near the confluence with Ditch A, and utilizing excavated material to raise First Colony Levee Improvement District's South Levee.

Bid Results

Water / Sewer

$5,288,784.00

Public - County

Site Work

70

30

26

8

Subscribe For Documents

133 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
76
Bidding Soon
2,716
All Active Projects
964
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2023

February 27, 2023

img_map_placeholder

Multiple Locations, Richmond, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.