BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Orange, California. Completed plans call for the renovation of a educational facility.

The Bid Proposal of a Bidder who does not possess a valid and in good standing Contractors License in the classification(s) set forth above will be rejected for non-responsiveness. Any Bidder not duly and properly licensed is subject to all penalties imposed by law. No payment shall be made for the Work unless and until the Registrar of Contractors verifies to the District that the Bidder awarded the Contract is properly and duly licensed for the Work. The Contract Time is 323 calendar days from date of Notice to Proceed to Final Completion. Failure to achieve the Contract Time will result in the assessment of Liquidated Damages as set forth in the Contract. Purchasing Portal Posting of Addenda and Bidder Questions Responses. During the course of bidding, the District may issue addenda ( Addenda ) or issue responses to bidder questions that do not result in issuance of Addenda ( Bidder Questions Responses ). The District will not distribute Addenda or Bidder Questions Responses; Addenda and Bidder Questions Responses will be posted on the Purchasing Webpage. The District s posting of Addenda and/or Bidder Questions Responses on the Purchasing Webpage is deemed the District s distribution of Addenda and/or Bidder Questions Responses to all bidders. Bid Security. Each Bid Proposal shall be accompanied by Bid Security in an amount equal to Ten Percent (10%) of the maximum amount of the Bid Proposal, inclusive of any additive Alternate Bid Item(s). Failure of any Bid Proposal to be accompanied by Bid Security in the form and in the amount required shall render such Bid Proposal to be non-responsive and rejected by the District. Labor & Materials Payment Bond; Performance Bond. Prior to commencement of the Work, the Bidder awarded the Contract shall deliver to the District two (2) each of Labor & Material Payment Bond and a Performance Bond issued by a California Admitted Surety in the form and content included in the Contract Documents each of which shall be in a penal sum equal to One Hundred Percent (100%) of the Contract Price. No Withdrawal of Bid Proposals. Bid Proposals shall not be withdrawn by any Bidder for a period of 90 calendar days after the opening of Bid Proposals. During this time, all Bidders shall guarantee prices quoted in their respective Bid Proposals.Project Plan Holder List. The District s Project Plan Holder List will be compiled exclusively from the sign-in sheet at the Mandatory Job Walk. Any Bidder failing to sign-in at the Mandatory Job Walk will be excluded from Project Plan Holder List and their Bid Proposal will be rejected by the District as being non-responsive. The District will not have a third party maintain a bid registry/plan holder list and will not distribute addenda directly to bidders/plan holders. The Contract for the Work, if awarded, will be by action of the District s Board of Trustees to the responsible Bidder submitting the lowest priced responsive Bid Proposal. If the Bid Proposal requires Bidders to propose prices for Alternate Bid Items, the District s selection of Alternate Bid Items, if any, for determination of the lowest priced Bid Proposal and for inclusion in the scope of the Contract to be awarded shall be in accordance with the Instructions to Bidders. The District reserves the right to waive immaterial irregularities or informalities in any Bid Proposal or in the bidding process. Additionally, the District reserves the right to reject all Bid Proposals. The lowest responsive bid for the Work shall be determined as follows: Base Bid Amount. 15. Disabled Veteran Business Enterprises ( DVBE ) Participation Goal. Pursuant to Military & Veterans Code 999.2 and the District s Board Policy, the District has established a Good Faith Participation Goal for DVBEs of Three Percent (3%) of the value of the Work. American Disabilities Act (ADA). It is the intention of the Rancho Santiago Community College District to comply with the Americans with Disabilities Acts (ADA) in all respects. If, as an attendee or a participant at this meeting, you will need special assistance, the Rancho Santiago Community College District will attempt to accommodate you in every reasonable manner. Please contact the Rancho Santiago Community College District, Facility Planning, District Construction and Support Services at 2323 N. Broadway, Suite 112, Santa Ana, California, 714-480-7510, three business days prior to the meeting to inform us of your particular needs so that appropriate accommodations may be made. All Bidder questions about the meaning or intent of the Contract Documents shall be directed to the District in writing by email to facilitiesbid@rsccd.edu ("Pre-Bid Questions"). Pre-Bid Questions and requests for clarifications must be submitted to the District by 5:00 P.M. December 20, 2022 on the District's Pre-Bid Clarification Form provided within. Bidders are solely responsible for submission of Pre-Bid Questions prior to such time/date

Award

Educational

$3,109,000.00

Public - City

Renovation

57

23

47

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
543
Active Projects
254
Bidding Soon
3,974
All Active Projects
1,822
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 7, 2023

April 10, 2023

February 27, 2024

img_map_placeholder

8045 E Chapman Ave, Orange, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.