BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a municipal facility in Longmont, Colorado. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Bid Intent Not Available Question Acceptance Deadline 12/22/2022 06:00 PM EST Questions are submitted online No The City owns the real property addressed at 129 Coffman Street in Longmont, Colorado. The property is approximately 0.32 acres. There is an existing structure, utility services, trees and fencing on the property. The primary work to be performed under this contract includes demolition of the existing structure and site clearing as further described in the Contract Documents. The structure is considered structurally unsound due to a major fire. Friable and non-friable asbestos is present at the facility. An asbestos inspection report is included in the Project Manual. Minimum Qualifications: The City of Longmont is seeking qualified contractors with applicable experience comparable to the Scope of Work, as described above, for the 129 Coffman Street Building Demolition. Bidders must meet or exceed the following minimum qualification criteria in order to be considered for award: The Contractor and the Contractor's on-site representative who has immediate charge of the Project shall each have satisfactorily completed the same responsibilities on at least one (1) building demolition project within the last five (5) years. If the Contractor is submitting on Bid Alternate 1 - Open Air Demolition, the Contractor and the Contractor's on-site representative who has immediate charge of the Project shall each have satisfactorily completed the same responsibilities including open air asbestos abatement design and permit approval via a variance request from the CDPHE on at least one (1) open-air demolition building demolition project within the last five (5) years. Qualifying projects must have been performed principally by the contractor's own forces. Work performed by other contractors or subcontractors will not be considered as qualifying. The Contractor will be permitted to sublet a portion of the Contract, however, the Contractor's organization shall perform work amounting to at least fifty (50) percent or more of the total original contract amount.

Post-Bid

Municipal

$300,000.00

Public - City

Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
38
Bidding Soon
944
All Active Projects
397
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.