BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a fire / police facility in Frisco, Colorado. Completed plans call for the renovation of a fire / police facility.

1. Remove existing snow fence. 2. Install engineered Roof Hugger system per Roof Hugger Design. 3. Install heated roof panels and backer material at all valleys and at eave below dormer as shown on Roof Plan. a. All electrical work must be performed by a Colorado Licensed Electrical Contractor. b. In addition to Heat Panel Information, Submittal must include: i. All Control Devices. ii. Clarify all disconnects of Snow Melting System shall be in accordance with NEC 426.50. iii. Clarify ground fault protection is in accordandance with NEC 426.28. iv. Clarify the protection method for the non-heating load is in accordance with NEC 426.23b. 4. Install specified Standing Seam Metal Roofing System. 5. Install all copings, ridge caps and gutter. 6. Install new snow fence at locations where previous snow fence was removed. Overlay with new roofing system Date Email Questions Due 1/5/2023. Date Email Answers Issued - 1/9/2023 Anticipated Design Start Complete Anticipated General Contractor Start 2/01/2023 Anticipated Construction Start/Finish 5/18/2023 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. Per C.R.S. 24-92-Part 2, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the State prevailing wage rate, of the regular, holiday, and overtime wages paid and the general prevailing payments on behalf of employees to lawful welfare, pension, vacation, apprentice training, and educational funds in the State, for each employee needed to execute the contract. Payments to the funds must constitute an ordinary business expense deduction for federal income tax purposes by contractors and subcontractors. Contractors are required to pay their employees at weekly intervals and shall comply with the enforcement provisions of C.R.S. 24-92-209. Contractors awarded a project of this size will be required to utilize the LCPTracker cloud-based labor compliance and certified payroll application. 2023*0129

Award

Fire / Police

$336,000.00

Public - State/Provincial

Renovation

16

23

4

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
55
Bidding Soon
924
All Active Projects
386
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2023

February 1, 2023

img_map_placeholder

201 Peak One Blvd, Frisco, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.