BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Dallas, Texas. Completed plans call for site work for a water / sewer project.

CONTRACT NO. 23-177 This contract consists of dredging five (5) locations including detention basins, lakes, and ponds within the City of Dallas. The Work to be performed under this Contract includes, but is not limited to: 1. Mobilization of personnel, equipment, and materials to the site. Establishing temporary lay- down and storage areas. Establishing temporary access roads, mobilization of dredge, boosters, all pipelines and any other ancillary equipment asrequired by the CONTRACTOR to complete the works. 2. Developing a Storm Water Pollution Prevention Plan (SWPPP) in accordance with specifications, laws, rules and maintaining Best Management Practices (BMPs) throughout construction. 3. Removing trees and brush as necessary for installing and maintaining the dredge slurry and return water pipelines: Including all permits, removal and proper disposal of any cleared trees and or vegetation. Owner must authorize all tree removals. 4. Site Preparation. Refer to Section 12 5. Debris removal: a. Remove and dispose of debris encountered in dredging process to an approved offsite disposal location, including tipping fees as necessary. 6. Site cleanup, restoration, and demobilization. a. Restore all areas to original condition prior to construction or satisfactory to the OWNER. City reserves the right to reject any or all Bids Milestone 1: Effective Start Date shall be no longer than 90 Calendar days after City Council award of this project. Liquidated Damages shall be $1,000 Per Calendar Day. Milestone 2: All base bid work and site restoration shall be completed within 380 Consecutive Calendar Days. Liquidated Damages shall be $1,000 Per Calendar Day. Milestone 3: All additive bid work and site restoration shall be completed within 60 Consecutive Calendar Days. Liquidated damages shall be $1,000 per calendar day.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

47

8

6

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
382
Active Projects
185
Bidding Soon
3,821
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2023

August 28, 2023

Project location map

Multiple Locations, Dallas, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.