Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 31, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Dallas, Texas. Completed plans call for site work for a water / sewer project.
CONTRACT NO. 23-177 This contract consists of dredging five (5) locations including detention basins, lakes, and ponds within the City of Dallas. The Work to be performed under this Contract includes, but is not limited to: 1. Mobilization of personnel, equipment, and materials to the site. Establishing temporary lay- down and storage areas. Establishing temporary access roads, mobilization of dredge, boosters, all pipelines and any other ancillary equipment asrequired by the CONTRACTOR to complete the works. 2. Developing a Storm Water Pollution Prevention Plan (SWPPP) in accordance with specifications, laws, rules and maintaining Best Management Practices (BMPs) throughout construction. 3. Removing trees and brush as necessary for installing and maintaining the dredge slurry and return water pipelines: Including all permits, removal and proper disposal of any cleared trees and or vegetation. Owner must authorize all tree removals. 4. Site Preparation. Refer to Section 12 5. Debris removal: a. Remove and dispose of debris encountered in dredging process to an approved offsite disposal location, including tipping fees as necessary. 6. Site cleanup, restoration, and demobilization. a. Restore all areas to original condition prior to construction or satisfactory to the OWNER. City reserves the right to reject any or all Bids Milestone 1: Effective Start Date shall be no longer than 90 Calendar days after City Council award of this project. Liquidated Damages shall be $1,000 Per Calendar Day. Milestone 2: All base bid work and site restoration shall be completed within 380 Consecutive Calendar Days. Liquidated Damages shall be $1,000 Per Calendar Day. Milestone 3: All additive bid work and site restoration shall be completed within 60 Consecutive Calendar Days. Liquidated damages shall be $1,000 per calendar day.
Post-Bid
Water / Sewer
$200,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2023
August 28, 2023
Multiple Locations, Dallas, TX
Related To This Project
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Sep 19 2023
Dallas, TX
--
Dallas, TX
Bid Date: Jan 09 2023
Dallas, TX
Bid Date: Feb 27 2023
Dallas, TX
Bid Date: Jan 04 2023
Dallas, TX
Bid Date: Jan 06 2023
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
