BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Shawano, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

(1) Furnish and place all signs, barricades and drums necessary to properly control traffic during construction. (2) Install erosion control devices (inlet protection) as required prior to construction. (3) Clear and grub trees designated for removal and properly dispose of these trees and roots in approved areas. (4) Saw-cut all pavements prior to removal for butt joints with new pavement. Pulverize, remove, haul and stockpile existing asphalt pavement and base course as designated by the Engineer / Owner. Remove existing concrete pavements as necessary to install utility improvements and construct street improvements. Properly dispose of all removed clean concrete at the Shawano Landfill on Rusch Road (M-F 7am - 3pm). Salvaged pulverized pavement and base may be hauled and stockpiled at the Shawano Landfill on Rusch Road (M-F 7am - 3pm) or the fill site located on Engel Drive. (5) Remove and properly dispose of all existing manholes, sewer mains, and laterals designated to be removed. Install sanitary sewer and all appurtenances in accordance with the plans and specifications. Connect existing sanitary sewers to remain to new sanitary manholes. Install new sanitary laterals from the new main to the property line. Reconnect to existing laterals at the property line. Furnish and properly install tracer wire. Backfill and compact excavated areas. All cost involved in stone bedding material, DEWATERING, or temporary pumping flow control, etc., shall be considered incidental and shall be the Contractors sole responsibility. (6) Remove and properly dispose of all existing watermain, water services, valves and hydrants designated to be removed. Install watermain and all appurtenances in accordance with the plans and specifications. Connect existing watermain (to remain) to new watermain. Install new water services from the new main to the property line, install new water service shut-off and connect to existing water service. Furnish and properly install tracer wire. Backfill and compact excavated areas. The Contractor shall assume responsibility for issues related to temporary service connection or reconnection of the water service. (7) Remove and replace, all concrete sidewalks, driveways and curb & gutter designated to be removed and replaced as shown on the plans. Properly dispose of all removed concrete sidewalks, driveways, and curb & gutter at the Shawano Landfill on Rusch Road. (8) Excavate any excess material from streets as shown on the plans as designated to be removed. Haul excess material to the clean fill site on Engel Drive. (9) Place geotextile grid with required overlaps on the prepared subgrade as shown on the plans and/or directed by the engineer. (10) Load, haul, place, and compact salvaged asphaltic pavement (3"-5" compacted thickness) and crushed concrete base course (4"-6" thickness) from the landfill over prepared subgrade on project streets to achieve a total compacted base course thickness as shown on the typical section for street construction. 175SPECIALP SP-1 (11) Fine grade base course for asphalt paving. Any soft street areas shall be brought to the attention of the engineer for examination and determnination of possible excavation of soft area prior to paving. Adjust all manhole castings and valve boxes to match new pavement elevations. Finish street grading shall be completed prior to final adjustment of manhole castings and valve boxes. Furnish, place and compact hot mix asphalt (HMA) pavement, in two (2) courses, over properly prepared base course. Construct concrete pavements as shown on the plans and where directed by Owner. (12) Site restore disturbed street areas with pulverized topsoil, fertilize, seed and mulch for restablishment of urban grass lawn. Proper compaction of the topsoil and seed-to-soil contact shall be performed to a finished elevation of the new adjacent street sidewalks, curbs and driveways. The contractor shall be responsible for successful establishment of vegetation (grass), in all of the disturbed areas. (13) Perform site clean-up. Est. Value Notes: Base Bid & Alternates Est. Completion Date: Oct. 27, 2023 Pre-Qualification: Yes Pre-Bid Meeting Info: None

Post-Bid

Roads / Highways

$950,000.00

Public - City

Paving, Site Work

13

10

5

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
35
Bidding Soon
961
All Active Projects
283
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 21, 2022

January 20, 2023

October 27, 2023

img_map_placeholder

Multiple Locations, Shawano, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.