EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2023 at 8:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a civil project in Harrisburg, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Cost Range: $50,000,000.00 - $999,999,999.00 As of April 7, 2023, a general contractor has been awarded. Construction is slated to commence July 10, 2023. This project provides for the furnishing of all labor, material, equipment and work necessary to perform staged construction for full-depth reconstruction and widening of the Pennsylvania Turnpike from two lanes in each direction to three lanes in each direction. The project includes the reconstruction of an interchange and the construction of three mainline bridges, twelve retaining walls, three sound barriers, six sign structures, and one DMS sign structure. The contract also provides for highway lighting modifications, CCTV cameras, drainage modifications, and maintenance and protection of traffic. Work items include, but are not limited to the following: 893,665 CY Excavation, Various Classes 389,087 SY Superpave Asphalt Mixture, Base Course, Various Depths 248,136 SY Asphalt Treated Permeable Base Course, 4" Depth 225,026 SY Rich Bottom Superpave Asphalt Mixture, 4" Depth 267,935 SY Stone Matrix Asphalt Mixture, Wearing Course, 2" Depth 179,631 SY Superpave Asphalt Mixture, Wearing Course, Various Depths 399,393 SY Superpave Asphalt Mixture, Binder Course, Various Depths 418,275 SY Subbase (No. 2A), 6" Depth 23,110 SY Plain Cement Concrete Pavement, 12" Depth 68,096 LF Pipes, Various Sizes and Types 511 EACH Inlets/Manholes/End Sections/Endwalls 51,944 LF Guide Rail/Concrete Barrier 50,701 LF Removal of Guide Rail/Concrete Barrier/Glare Screen 132,541 LF Temporary Concrete Barrier (Includes Structure Mounted and Glare Screen) 57,730 LF Right-of-Way Fence 156,422 CY Class 3 Excavation, Structures 197,233 SF Aesthetic Concrete Coating 1,278,967 LB Reinforcement Bars, Plain, Epoxy Coated, and Stainless Steel 5,612 CY Over-Excavation and Backfilling with Cement and Rock 13,754 TON Select Granular Material (2RC) 39,665 CY Selected Borrow Excavation Rock, Type B 197,563 SF Precast Concrete Wall Panels (Retaining and Sound) 790,882 LB Steel Wall Posts (Structure and Ground Mounted) 3,095 LF Concrete Beams, All Sizes 7,344 LF Steel Piles 4,230 LF Drilled Caissons in Rock and Soil, All Sizes 285,679 SY Topsoil, 6" Depth 5,037 SF Signs 696,258 LF Pavement Markings Milepost 311.60 is located approximately 0.3 miles west of the Downingtown Interchange, Exit 312 and Milepost 316.19 is located approximately 3.5 mile west of the SR 29 Interchange, Exit 320, in Chester County, Pennsylvania. The proposal and plans are published electronically in EBS and are available to registered business partners for downloading and printing. An electronic bid bond, from an approved vendor, with corporate surety, in the amount of five percent (5%) of the bid must be submitted with the proposal as bid security. The bid security of the three (3) low bidders will be retained until the execution of the contract. (The normal time for execution of the contract is approximately four [4] weeks.) A Prequalification Certification and Applicable Capacity Rating assigned by the Prequalification Office of the Pennsylvania Department of Transportation is a necessary prerequisite for bidding on this project. The opening and listing of bids not meeting all the terms and conditions of the bid advertisement or bid procedures does not act as a waiver or modification of any requirements contained in the bid advertisement or bid procedure. The Provisions of the Pennsylvania Prevailing Wage Act of August 15, 1961, P.L. 987, as amended, together with the rates and regulations promulgated by the Secretary of Labor and Industry applicable thereto, shall apply to this contract. Any questions for this project must be submitted electronically in EBS by registered business partners. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$214,177,555.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

2726

7

974

15

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Facility Electrical Power Generating and Storing Equipment, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Drilled Caissons, Caissons, Foundation Anchors, Tunneling and Mining, Shaft Construction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
100
Bidding Soon
1,414
All Active Projects
641
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2023

July 10, 2023

img_map_placeholder

Multiple Locations, Harrisburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Roadway and Bridge Reconstruction Between Milepost 311.60 and Milepost 316.19 in Chester County

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.