BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Burlington, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

ADA Curb Ramps, Sanitary Sewer (Gravity), Sewer Pump Station, Sewer and Water Construction, Directional Bore, Paving (Trail Paving), Directional Drilling The work includes furnishing of all materials and equipment and performance of the following work, per the Plans, Specifications and Contract Documents (PS & CD). The Base Bid work for the above contract includes a new 12-inch sanitary main along S Pine Street, from S.T.H. 36/11 (Burlington Bypass) to Liberty Drive, a new multi-use asphalt path along S Pine Street and Liberty Drive, and two lift station improvements. Major work items and approximate quantities for which bids are requested include: 1,350 SY of clearing and grubbing, 1,200 tons of asphalt, 3,270 tons of base aggregate, 2,000 CY of excavation common, 250 LF of concrete curb and gutter, 1,575 SF of concrete sidewalk, 2,700 LF of open cut PVC sanitary sewer main and laterals, 400 LF of sanitary sewer jack and bore, 825 LF of sanitary lateral directional drilling, 220 VF of sanitary manholes, 135 LF of PVC watermain laterals and hydrant leads, 550 LF of directional drilling for water service laterals, and 16,325 SY of landscape restoration. These improvements also include removal of existing concrete and asphalt, new manhole frames and covers, relocation of existing hydrant, new water valves, new corporation stop and curb boxes, existing well abandonment, dewatering, concrete curb ramps, signage, pavement markings, traffic control, and erosion control. Improvements will be made to the Springbrook and Bohner's Lake lift stations including new pumps, control panels, and generators. The Work will be substantially completed on or before June 30, 2023, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before July 31, 2023. If needed contractor may stabilize for winter and restore in spring under warranty. Refer to the Special Provisions. The Work will be substantially completed on or before June 30, 2023, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before July 31, 2023. If needed contractor may stabilize for winter and restore in spring under warranty. Refer to the Special Provisions.

Bid Results

Roads / Highways

$3,627,734.00

Public - City

Paving, Site Work

112

16

55

6

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
115
Bidding Soon
1,968
All Active Projects
818
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2023

March 6, 2023

img_map_placeholder

S Pine St, Burlington, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.