BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Hazlehurst, Georgia. Working plans call for the renovation of a educational facility; and theater / auditorium.

The Jeff Davis Board of Education ("BOE") as ("Owner") is soliciting Proposals from firms interested in providing construction management at-risk services for the Renovation to the Auditorium of the Jeff Davis High School project known as Project "Jeff Davis High School Auditorium Renovation" for the Jeff Davis County Board of Education, Hazlehurst, Georgia. This Request for Proposals (RFP) seeks to identify a CMR for the above-mentioned services. The RFP's will be reviewed and evaluated by a "selection committee" and a CMR will be selected based on a scoring matrix provided in the RFP. Firm interviews will be conducted at the discretion of the selection committee. The BOE reserves the right to reject any or all proposals, and to waive technicalities and informalities at their discretion. Interior Modifications and Renovations to the existing High School Auditorium located on 156 Collins Street, Hazlehurst, GA. The High School Auditorium Renovations will include but are not limited to: 1. Removal and replacement of all existing auditorium seating with new auditorium seating. 2. Cleaning, prepping, and repainting the existing Auditorium space (walls and ceilings) 3. Removal and replacement of all existing auditorium flooring with new carpeting, LVT, as well as new stair tread & riser covers. 4. Removal of and replacement of all acoustical sound panels with new acoustical sound panels. 5. Removal of and replacement of the front-of-house curtain with new front-of-house curtain 6. Removal and replacement of all 4" resilient base throughout the Auditorium. 7. Rewiring and upgrading electrical and auxiliary wiring in select areas of the Auditorium. 8. Removing select area floor finishes and installing new floor finishes. 9. Sanding and refinishing the existing stage wood flooring. 10. Various other small improvements as detailed in the Construction Documents.

Final Planning

Theaters / Auditoriums

$300,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
18
Bidding Soon
310
All Active Projects
176
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 23, 2022

February 20, 2023

img_map_placeholder

156 Collins St, Hazlehurst, GA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.