Site work for a water / sewer project in Broken Arrow, Oklahoma. Completed plans call for site work for a water / sewer project.

County Line Phase IIIA Manhole Replacement: This project includes the removal and replacement of 12 concrete sanitary sewer manhole structures and relocation of 336 linear feet of 18" sanitary sewer pipe; and installation of 84 linear feet of steel encased road crossing. Construction time will be 120 calendar days. Funding for this project is provided through the Clean Water State Revolving Fund (CWSRF) program. As such, compliance with the Davis Bacon Act, American Iron and Steel, and Labor Standards Contract Provisions is mandatory. This project is to be financed by a CWSRF loan from the Oklahoma Water Resources Board (OWRB) and shall be referred to as Project No. ORF-21-0028-CW. The following requirements and regulations must be complied with: A. "Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or physical handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended." B. "Each bidder must fully comply with the requirements, terms and conditions of the Environmental Protection Agency's Disadvantaged Business Enterprise Requirements including employing the six (6) good faith efforts and soliciting disadvantaged business enterprises during the performance of this contract. The bidder commits itself to following the good faith efforts to solicit disadvantaged business enterprises contained herein and all other requirements, terms and conditions of these bid conditions by submitting a properly signed bid. Requirements are contained in OWRB's Guidance and Procedures, ORF-267." C. "Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and sub-contractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code and 29 CFR parts 1,3, and 5. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. Sworn statement of the Bidder's assets and liabilities, technical qualifications and performance in the form of the latest annual report and financial statement are not required to be submitted with the Bidder's Proposal, but BAMA may require such statements prior to award of the construction contract. The Statement of Qualifications & Experience using the form found in Section II Proposal Documents, must be submitted with the bid and include, as a minimum, the information required herein. Failure to submit the information required in these documents may result in BAMA considering the Bid non-responsive and result in rejection of the Bid by BAMA. Bidders may be required to provide supplemental information if requested by BAMA to clarify, enhance or supplement the information provided in the Statement of Qualifications & Experience. The apparent successful Bidder shall, within two (2) days after Bid opening, submit to BAMA a list of the Subcontractors, Suppliers, individuals or entities proposed for the following portions of the Work: sewer line installation, manhole installation, and all appurtenances, excavation and grading. Such list shall be accompanied by a Statement of Qualifications & Experience, using the forms found in Section II Proposal Documents, with pertinent information regarding similar projects and other evidence of qualification and experience for each such Subcontractor, Supplier, or other individual or entity. If BAMA or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, BAMA may, before the Notice of Award is given, request apparent successful Bidder to submit an acceptable substitute, within one (1) day of notification. If apparent Successful Bidder declines to make any such substitution, BAMA may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. In such event, the next lowest Bidder shall, within two (2) days after requested by BAMA, submit to BAMA the above required list of the Subcontractors, Suppliers, and other individuals or entities. In evaluating whether a Bidder is responsible, BAMA will consider the qualifications and experience of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided above. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to BAMA. The successful Bidder must, within ten (10) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by BAMA in the amounts equal to the Contract price. Goals for MBE CONSTRUCTION 13.94%; SUPPLIES - 7.48%; SERVICES - 14.29%; EQUIPMENT - 9.13% Goals for WBE CONSTRUCTION - 6.92%; SUPPLIES - 0; SERVICES - 26.51%; EQUIPMENT - 19.90% Project No. ORF-21-0028-CW Questions concerning the project can be discussed by contacting the Engineering & Construction Department by email at engineering.construction@brokenarrowok.gov or by phone at (918)259-7000 x5414. N

Award

Water / Sewer

$763,926.00

Public - County

Site Work

17

14

10

10

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
61
Bidding Soon
750
All Active Projects
374
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2023

February 20, 2023

img_map_placeholder

Multiple Locations, Broken Arrow, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

County Line Phase Three A Manhole Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.