Site work for a water / sewer project in Broken Arrow, Oklahoma. Completed plans call for site work for a water / sewer project.

County Line Phase IIIA Manhole Replacement: This project includes the removal and replacement of 12 concrete sanitary sewer manhole structures and relocation of 336 linear feet of 18" sanitary sewer pipe; and installation of 84 linear feet of steel encased road crossing. Construction time will be 120 calendar days. Funding for this project is provided through the Clean Water State Revolving Fund (CWSRF) program. As such, compliance with the Davis Bacon Act, American Iron and Steel, and Labor Standards Contract Provisions is mandatory. This project is to be financed by a CWSRF loan from the Oklahoma Water Resources Board (OWRB) and shall be referred to as Project No. ORF-21-0028-CW. The following requirements and regulations must be complied with: A. "Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or physical handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended." B. "Each bidder must fully comply with the requirements, terms and conditions of the Environmental Protection Agency's Disadvantaged Business Enterprise Requirements including employing the six (6) good faith efforts and soliciting disadvantaged business enterprises during the performance of this contract. The bidder commits itself to following the good faith efforts to solicit disadvantaged business enterprises contained herein and all other requirements, terms and conditions of these bid conditions by submitting a properly signed bid. Requirements are contained in OWRB's Guidance and Procedures, ORF-267." C. "Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and sub-contractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code and 29 CFR parts 1,3, and 5. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. Sworn statement of the Bidder's assets and liabilities, technical qualifications and performance in the form of the latest annual report and financial statement are not required to be submitted with the Bidder's Proposal, but BAMA may require such statements prior to award of the construction contract. The Statement of Qualifications & Experience using the form found in Section II Proposal Documents, must be submitted with the bid and include, as a minimum, the information required herein. Failure to submit the information required in these documents may result in BAMA considering the Bid non-responsive and result in rejection of the Bid by BAMA. Bidders may be required to provide supplemental information if requested by BAMA to clarify, enhance or supplement the information provided in the Statement of Qualifications & Experience. The apparent successful Bidder shall, within two (2) days after Bid opening, submit to BAMA a list of the Subcontractors, Suppliers, individuals or entities proposed for the following portions of the Work: sewer line installation, manhole installation, and all appurtenances, excavation and grading. Such list shall be accompanied by a Statement of Qualifications & Experience, using the forms found in Section II Proposal Documents, with pertinent information regarding similar projects and other evidence of qualification and experience for each such Subcontractor, Supplier, or other individual or entity. If BAMA or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, BAMA may, before the Notice of Award is given, request apparent successful Bidder to submit an acceptable substitute, within one (1) day of notification. If apparent Successful Bidder declines to make any such substitution, BAMA may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. In such event, the next lowest Bidder shall, within two (2) days after requested by BAMA, submit to BAMA the above required list of the Subcontractors, Suppliers, and other individuals or entities. In evaluating whether a Bidder is responsible, BAMA will consider the qualifications and experience of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided above. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to BAMA. The successful Bidder must, within ten (10) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by BAMA in the amounts equal to the Contract price. Goals for MBE CONSTRUCTION 13.94%; SUPPLIES - 7.48%; SERVICES - 14.29%; EQUIPMENT - 9.13% Goals for WBE CONSTRUCTION - 6.92%; SUPPLIES - 0; SERVICES - 26.51%; EQUIPMENT - 19.90% Project No. ORF-21-0028-CW Questions concerning the project can be discussed by contacting the Engineering & Construction Department by email at engineering.construction@brokenarrowok.gov or by phone at (918)259-7000 x5414. N

Award

Water / Sewer

$763,926.00

Public - County

Site Work

17

14

10

10

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
61
Bidding Soon
704
All Active Projects
325
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2023

February 20, 2023

img_map_placeholder

Multiple Locations, Broken Arrow, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.