BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Springfield, Missouri. Completed plans call for site work for a water / sewer project.

LOCATION OF PROJECT- The Work is located below the McDaniel Lake Dam on the little Sac River, 5101 N Farm Road 145 Springfield, MO 65803. The project consists of stabilizing 190 ft. of creek bank downstream of the McDaniel Lake Dam using gabion baskets and rip rap to protect an existing City Utilities 24-inch cast iron water main. The project consists of stabilizing 190 ft. of creek bank downstream of the McDaniel Lake Dam using gabion baskets and rip rap to protect an existing City Utilities 24-inch cast iron water main. The gabion wall is assumed to bear on bedrock below the channel, with a 9 ft. tall gabion basket wall as the typical section (base bid). However, depth to bedrock and depth of soils in the channel are anticipated to be variable. If the event bedrock is shallower, a shorter gabion wall can be constructed. In the event bedrock is deeper, up to a 12 ft. tall gabion wall is permissible (bearing on bedrock). Deeper bedrock may be a result of natural variability in the bedrock surface or in the event the excavated sidewall below the water main is not stable, the back of wall may need to be offset towards the center of the creek to maintain stability of the water main, with deeper bedrock anticipated in this situation. In any event, maintaining stability of the water main during gabion wall construction is required. A gabion wall (9 ft) bearing on creek gravel with the addition of a gabion mattress placed in front of the wall for scour protection is also permissible. The bid quantities below assume a 9 ft. tall gabion wall bearing on bedrock as the typical cross section, but unit prices for each of the alternate wall heights/types are also requested since several wall heights/types along the alignment may be required due to varying depth of bedrock and the stability of the sidewall below the water main. All other work items/expenses required to construct the project should be included in the bid unit line items on the bid form.

Award

Water / Sewer

$121,000.00

Public - City

Site Work

5

9

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
18
Bidding Soon
346
All Active Projects
135
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2022

January 30, 2023

img_map_placeholder

5101 N Farm Rd 145, Springfield, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.