BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Pontiac, Michigan. Working plans call for site work for a road / highway; and for paving for a road / highway.

**As of January 30, 2023, the City has rejected all bids for this project due to the proposed costs drastically exceeding the engineer’s estimate. Job Location MLK @ GTW-RR Question Acceptance Deadline 12/27/2022 02:00 PM EST Questions are submitted online Yes Work will be performed on Martin Luther King, Jr. Blvd. over Grand Trunk Western Railroad Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % The estimated quantities involved in this work consist principally of the following: Description Backfill, Structure, CIP 5.00 CYD Excavation, Fdn 5.00 CYD Stiffeners, Furn, Fab, and Erect 934.00 LB Support, Column, Temp, Left in Place 9.00 EA Railroad Inspection and Flagging 30,000 DLR Railroad Protection 10,000 DLR Plastic Drum, Fluorescent, Furn 33.00 EA Martin Luther King Jr. Blvd over GTWRR, between Woodward Avenue (M-1) and South Boulevard, City of Pontiac, Michigan

Final Planning

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

8

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
335
Active Projects
184
Bidding Soon
2,399
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2023

July 30, 2023

Project location map

Martin Luther King Jr Blvd N, Pontiac, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.