BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Willow Park, Texas. Completed plans call for site work for a water / sewer project.

Furnishing and installing approximately 5,200 linear feet of 10-inch HDPE effluent force main, 1,980 linear feet of 12-inch HDPE effluent force main, an effluent lift station and associated appurtenances. This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract or contracts awarded under this Invitation for Bid are expected to be funded in part by financial assistance from the Texas Water Development Board. Neither the State of Texas nor its departments, agencies, or employees are or will be a party to this Advertisement for Bids or any resulting contract. The Owner reserves the right to waive any informalities and to reject any or all bids. Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of Section 608 of the Federal Water Pollution Control Act (33 U.S.C. 1388). In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex (including pregnancy), sexual identity, gender identity, national origin, age (40 or older), disability or genetic information. This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned Business Enterprise (M/WBE) businesses. EPA rules require that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. For more details on the DBE Program and the current, applicable fair share goals, please visit www.twdb.texas.gov/dbe. fully complete the project within 270 consecutive calendar days thereafter. Bid Results Base Bid Schedule A Jrm Construction - $637745 Base Bid Schedule B Jrm Construction - $149816 Base Bid Schedule C Jrm Construction - $121328 Base Bid Schedule D Rk Construction - $315000

Bid Results

Water / Sewer

$1,223,889.00

Public - City

Site Work

21

22

7

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
57
Bidding Soon
3,346
All Active Projects
1,324
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.